Genentech A Discussion Winter 2018Joseph Milner, RSM54011.

Slides:



Advertisements
Presentaciones similares
Spanish Interrogatives. Who? ¿Quién? Who? (multiple people) ¿Quiénes?
Advertisements

Articles, nouns and contractions oh my!. The POWER of the article THE 1. There are four ways to express THE in Spanish 2. The four ways are: El La Los.
Negatives and Questions. Negatives Consider the following sentences: Juan estudia mucho. Marta y Antonio viven en Georgia. Rita y el chico necesitan.
saquen la tarea en la página 57, ejercicio 1 ejemplos 4 y 5
The Normal Distribution To calculate the probability of a Normal distribution between a and b:
Time Expression with Hacer Grammar Essential #106.
Spanish Interrogatives. Who? ¿Quién? Who? (multiple people) ¿Quiénes?
Digital Photography: Selfie Slides Liliana Martinez 10/27/14 4b.
¿Qué haces en la escuela? Question words, objects, yo-go’s.
Water Conservation: water conservation is very important to the world, not only because we waste it when we don’t need it, but because were wasting water.
Formal Commands! Telling people what to do…… You speak, or you are speaking……Hablas, estás hablando This is different from telling (commanding) someone.
Vámonos Write how many of each object appears in each picture Example: dos lápices Hoy es el dieciocho de septiembre.
Time Telling time is rather easy. You only need to know the numbers up to 59 to be able to tell the time.
Formal Commands! Ten-Hut! In this presentation, you will learn about making commands in Spanish.
BARTERING. What is Bartering? Bartering is negotiating a lower price between a buyer and a seller of a good or service Bartering is negotiating a lower.
LOS VERBOS!!!. We already know these phrases in Spanish:
English Language II (2). English Language I (2) Warm-up.
Verbs like Gustar Notes/ Examples.
Understanding Documents from Mexico—Part 1 Naming Conventions, Birth Certificates, and Immunization Records Sonja Williams Migrant Education Program NCDPI.
-go Verbs There is a small but very important group of verbs that we call the “-go” verbs. These verbs are : Hacer: Poner: Salir: Tener: Traer: Venir:
UNIVERSIDAD AUTÓNOMA DEL ESTADO DE HIDALGO ESCUELA SUPERIOR DE ZIMAPÁN
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
-go Verbs There is a small but very important group of verbs that we call the “-go” verbs. These verbs are: Hacer: to make/do Poner: to put Salir:
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
Gustar V. Encantar.
EspaÑol 1 Lesson 3 30 de Agosto de 2016
Avancemos 3 – Unidad 2 Lección 1
Las clases de Sra. Schwarz Realidades 1
(How to tell time in Spanish)
JUGAR to play a sport or a game
Time Expression with Hacer
First Grade Dual High Frequency Words
Project 1: Protecting the Earth and the Natural Environment Sample.
More sentences that contain if…
Warm-up Fill in the blank with the correct form of the verb “ser” for each subject (p. 35): 1. Yo _______________ de Savannah. 2. Mis amigas ________.
Para Empezar tres de enero
¿Qué hora es?.
CORALS ARE DYING WHAT ARE CORALS AND WHAT IS HAPPENENING TO THEM ? WHY WE CHOSE TO TALK ABOUT THIS? We choose this topic because we do find the ocean a.
Final Proyect. The Chinese reject gifts several times - usually three, though they may be more - before accepting them. If you are in that situation you.
Indefinite Articles ¿cuánto? mucho poco
Hola, buenas tardes. ¿Cómo se llama?
Ser y Estar To be or….to be?
Gramática (pg 9 del paquete rosado)
Los números.
Recetas 3 Objetivo: Hacer preguntas Hablar sobre la comida
Gender Equality By Sandra y Estela.
Preparing for the Persuasive essay
Quasimodo: Tienes que hacer parte D de la tarea..
“To Be” or not “To Be” Ser vs. Estar.
Forming questions.
Aim: To review listening strategies
Hoy es lunes el veinticuatro de septiembre.
Informacion PIIRS
Kindergarten Spanish High Frequency Words
Quasimodo: Traducir Our mother is hardworking.
Question Formation Spanish I Page 52.
Part II of your project.

Gustar, Interesar, Aburrir
El agua.
My life Name: benjamín Aravena barrios Thicher: Alexis fernandes DATE: 26|06|2018 COURSE: 7°BASICO.
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Regular –ar (present tense)
Astronomy has really big numbers. Distance between Earth and Sun meters kilometers This is the closest star.
How much? - How many? English Grammar. When we want to know the quantity or amount of something, we ask questions starting with How much and How many.
The causative is a common structure in English. It is used when one thing or person causes another thing or person to do something.
Globalization Politics and the preservation of nation state.
a. Which job do you think pays more? I think an assistant chef earns more, as he spends all day working, while the dog walker earns according to the dogs.
Las Preguntas (the questions) Tengo una pregunta… Sí, Juan habla mucho con el profesor en clase. No, Juan no habla mucho en clase. s vo s vo Forming.
Transcripción de la presentación:

Genentech A Discussion Winter 2018Joseph Milner, RSM54011

Issues to Consider To build or not to build? If build, what does one build? If build, when? If build, where? Winter 2018Joseph Milner, RSM54012

What to do? Evaluate the investment value Determine expected losses in each of the years. Compare the value of the lost sales to the cost of building capacity Everything else is details. Consider alternatives to investment Consider the implications with regard to the firm’s strategy Winter 2018Joseph Milner, RSM54013

An Approach to Estimating the Value Demand Estimation Sources of uncertainty Estimating the cost of loss sales ($/kg) Estimating the lost sales (kg) Finding the Expected NPV of the losses Winter 2018Joseph Milner, RSM54014

Demand estimation Trial Stage Probability of Success Told 50% chance in Stages II and III So likelihood a Stage II drug is eventually approved is 50% x 50% = 25% In reality, probability of transitioning from Stage II to III may be 40% In reality, probability of transitioning from Stage III to approval may be 60% But that implies likelihood from Stage II to approval is 40% x 60% = 24%. In reality, there are other considerations on the probability of success Winter 2018Joseph Milner, RSM54015

Probability of Success Examples Some are more clear: Breast, other: Phase III so 50% Pancreatic, front-line: Phase II so 25% Lung (NSCLC): Phase III or 50% (Stated on page 7 and Exhibit 5, though Exhibit 11 says II/III) Some are less clear: Breast, Front-Line: Phase II/III so 38%? Some are very unclear: Multiple Phase III colorectal Multiple Phase II Breast Winter 2018Joseph Milner, RSM54016

Issues on arriving at estimated demand in kg Number of cancer patients Estimated penetration Grams per dose Doses per year Winter 2018Joseph Milner, RSM54017

Estimating Demand Colorectal Other Total Avastin Demand Winter 2018Joseph Milner, RSM54018

Sources of Demand Uncertainty Winter 2018Joseph Milner, RSM54019

Sources of Supply Uncertainty Winter 2018Joseph Milner, RSM540110

Estimating the margin per drug: 2003 Product Sales2621 COGS480 Contribution2141 Margin %82% Production900kg Margin per gram $2,142M/900kg = $2,379/gram Winter 2018Joseph Milner, RSM540111

Estimating the margin per gram Avastin Price per dose $2,000 Margin per dose 82% x 2000 = $1,634 Grams per dose Margin per gram$1,634 / = $4,357 Winter 2018Joseph Milner, RSM540112

Options Winter 2018Joseph Milner, RSM540113

Estimating the lost sales (kg): Do nothing Consider 2012 If we do not build the capacity is 2808 kg Estimate demand for Avastin to be 743kg Other drug (not Lucentis/Omnitarg)1375kg Lucentis/Omnitarg149kg Total2267kg Capacity Utilization = 2267/2808 = 81% What does this imply? Winter 2018Joseph Milner, RSM540114

Demand vs. Capacity 2012 Winter 2018Joseph Milner, RSM % 83% of the time all demand is served. 17% of the time some demand is lost. Guess the conditional average loss = 300 kg So 83% x 0 loss + 17% x 300 kg = Expected Loss = 51 kg 83% 300

How many sales do we lose in 2012? Winter 2018Joseph Milner, RSM540116

Should we build? Losses Savings Do Nothing$1,070M Build 12 x 12$537M$533M Build 8 x 25$516M$554M Find the Expected Lost Sales for each of the years Multiply by the appropriate margin. Calculate the NPV of the Losses Observe that building a 12 x 12 plant is marginally valuable. Building an 8 x 25 plant has negative NPV. Winter 2018Joseph Milner, RSM540117

To build or not depends on the variability Variability = 20%Losses Savings Do Nothing653 Build 12 x 12332$321M Build 8 x 25327$326M Variability = 25%Losses Savings Do Nothing1070 Build 12 x 12537$533M Build 8 x 25516$554M Variability = 30%Losses Savings Do Nothing1555 Build 12 x 12799$756M Build 8 x 25747$808M Why is building more valuable when there is higher variability? Winter 2018Joseph Milner, RSM540118

What do else do we need to consider? Winter 2018Joseph Milner, RSM540119

Should we wait? Consider Lucentis. Expected Demand = 125kg. It is easier to consider expected profit instead of loss. If we build, expected profit is Expected Revenue - Lost sales - $500M $36,943 -$500 = $36,443 If we wait and Lucentis is approved, we would certainly build. Profit = $39,261 If we wait and Lucentis is not approved, we would not build. Profit = $33,724 Winter 2018Joseph Milner, RSM540120

A Decision Tree Winter 2018Joseph Milner, RSM Build $36,443 Wait Lucentis Approved p=0.5 Lucentis Not Approved, p=0.5 $39261 $33,724 Expected Value = $36,492

Annual demands are not independent In the model we assume that each year we see a different outcome. But there is strong serial dependency year to year. In particular, drugs that are approved tend to stay approved, and drugs that are denied, tend to stay denied. So we really should model the correlation of demand year to year. Doing so using a model such as the one we have is difficult. But one can simulate out many outcomes of the trials to estimate the value of an is an Excel add-on that allows us to do so. Winter 2018Joseph Milner, RSM540122

12x12000 Facility vs. Not Building Winter 2018Joseph Milner, RSM540123

8x25000 Facility vs. Not Building Winter 2018Joseph Milner, RSM540124