Head Offices: USA: NORTH MIAMI BEACH  33179  FLORIDA 1835 NE Miami Gardens Dr, # 163 PHONE 001-305-491-5599 AUSTRIA:

Slides:



Advertisements
Presentaciones similares
© Frontier Economics Ltd, London. ALIANZAS PÚBLICO-PRIVADAS PARA EL DESARROLLO DE LAS INFRAESTRUCTURAS EN AMÉRICA LATINA OPCIONES PÚBLICO-PRIVADAS DE FINANCIACIÓN.
Advertisements

La entrevista Mosaicos, pp. 325, 355. After her positive experience at the job fair, Malena has decided to go for an interview for a position in perfume.
CENTRALES ELÉCTRICAS.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA
La Eficiencia Energética y los Retos para satisfacer la demanda de energía eléctrica en Latinoamérica y el Caribe Agosto, 2011.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 726 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Wastewater Treatment.
CENTRALES HIDROELÉCTRICAS
DESARROLLO ENERGÉTICO DE SAN MARTÍN
TALLER Integrantes: Alexis Sánchez Jackeline Ortiz Pilar Urrutia.
Clusters and Technopoles in Emerging Economies 2 cases in Chile By Cristobal Garcia.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 1 Brief Description: Design, construction, implementation, operation and maintenance of two wastewater.
1 Estimación de los aportes en régimen natural en el Bajo Ebro Estimation of Virgin Flows in the Lower Ebro River Francesc Gallart, Pilar Llorens Instituto.
Enel Green Power Empresa del Grupo Enel para el desarrollo de energías renovables Valparaíso, 14 de Septiembre de 2011.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 573 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Wastewater Collection.
CENTRALES HIDROELÉCTRICAS
U.S. - Mexico Border Technology Exchange Program (BTEP)
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 445 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Wastewater.
Presentado al Pleno Senatorial de la República Jueves 1 de Mayo de 2014 Aquiles Bermúdez Presidente Zonas Francas: Necesidades y Propuestas para mejor.
EVOLUCIÓN Y REVOLUCIÓN EN LA PRODUCCIÓN Y CONSUMO DE GAS NATURAL ISIDRO MORALES EGAP, TECNOLÓGICO DE MONTERREY. Octubre17, 2012 SEGUNDO CONGRESO NACIONAL.
PARTICIPACION SOCIEDAD “MINICENTRAL HIDROELECTRICA DIUTO LTDA.”
“PROYECTOS DE GENERACIÓN LIMPIA EN EL ORIENTE DEL DEPARTAMENTO DE CALDAS. APROVECHAMIENTO HIDROELÉCTRICO DE LOS RÍOS GUARINÓ, LA MIEL, PENSILVANIA, EL.
Centrales Eléctricas del Caribe – CETECA
Sergio Pastor de Vega 3º Diversificación IES Leopoldo Cano
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 643 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion of.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 621 Brief Description: Breve Descripción del Proyecto: Project Name and Location: Solid Waste.
FACULTAD DE INGENIERÍA DEPARTAMENTO DE INDUSTRIA UNIVERSIDAD TECNOLÓGICA METROPOLITANA ESCUELA DE INDUSTRIA EVALUACIÓN TÉCNICA PARA LICITACIÓN EN SONDAJES.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 579 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Wastewater Collection.
Carrera 7 No 71 – 21 Torre B Ofc TEL (571) – FAX (571) Bogotá - Colombia.
LA TRANSICIÓN ENERGÉTICA Y EL DESARROLLO DE LAS ENERGÍAS ALTERNAS: Oportunidades y Responsabilidades. Mayo 3, 2011 Seguridad y Sustentabilidad Energéticas.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 735 Brief Description:Breve Descripción del Proyecto: Project Name and Location : SunPeak Solar.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 728 Brief Description: Breve Descripción del Proyecto: Project Name and Location: Basic Environmental.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 499 Brief Description: Monterrey, NL - Treated wastewater distribution network expansion.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 553 Brief Description: Comprehensive Solid Waste Program and Closure of Open Dump in.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 506 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Expansion.
Los resultados del mercado asegurador Análisis de la performance técnica y financiera XIII Conferencia de la Industria del Seguro.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 608 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Construction.
Science Career Research Project By Jose pineda. Name of Job: Electrical Engineering I like that I would like to invent new electric and new social networks.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 492 Brief Description: Construction of the Esxpansion of the Wastewater Collection System,
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 589 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion of.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 763 Brief Description:Breve Descripción del Proyecto: Project Name and Location: ASTROSOL First.
Centro de Investigación en Energía, UNAM Centro de Investigación en Energía, UNAM Jorge M. Islas Samperio Simposium “Transición Energética y Oportunidades.
BILINGUAL TRAVEL AGENCY VOCATIONAL TRAINING COURSE: 1st year. BILINGUAL PROFESSIONAL SUBJECT: ORGANIZACIÓN Y CONTROL EN AGENCIAS DE VIAJES (O.C.A.) Organization.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 724 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Construction.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 740 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Improvements.
NOTICIAS ITD ha conseguido el paquete para la definición de la SAM en madurez A, incluyendo toda la estructura primaria y los sistemas del HTP. La generación.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 674 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion of.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 585 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Expansion of.
Estudios necesarios para la construcción de una hidroeléctrica.
Energy In Our Life (Spanish Team) Gobierno de Canarias.
El Salvador san salvador Seth Dodd. Guatemala, honduras.
Taller técnico sobre compilación de Cuentas de Agua en América Latina Santiago Chile Junio 2009 Dharmo Rojas, INE Mesenia Atenas, DGA.
Capacity Development for the CDMOficina de Desarrollo Limpio - Bolivia Evaluación del Proyecto CD4CDM Capacity Development for the CDM Tercer Taller Regional.
JUAN ANTONIO ARRESE LUCO DIRECTOR DE OBRAS HIDRAULICAS
LA UNIDAD DE ADMINISTRACION Y FISCALIZACION DEL PROYECTO HIDROELECTRICO QUIJOS INFORMA: LA UNIDAD DE ADMINISTRACION Y FISCALIZACION DEL PROYECTO HIDROELECTRICO.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 581 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Expansion and.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco RENAISSANCE - ZARAGOZA - SPAIN 1.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 645 Brief Description: Construction of a solid waste Sanitary Landfill in the Municipality of.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 580 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion.
MDD DIVISION DIRECT DRIVE MOTORS. Reservados todos los derechos por Vascat, S.A. ¿WHAT IS A DIRECT DRIVE TORQUE MOTOR?  Synchronous permanent magnet.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 593 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion of.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 584 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Wastewater Collection.
USAID/ CAM Illegal, Undocumented and Unreported Fishing in Central America 1 By Luis Ramos.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 672 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Frontera FIRST.
1 Mitigación al Cambio climático y sostenibilidad ambiental: El desafío del financiamiento Bogotá, 18 de noviembre 2010.
Acelerando las Inversiones en Energía Renovable Energía Renovable en Centroamérica y Panamá.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 289 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Project.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 177 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Improvement.
Overseas Private Investment Corporation Access to Finance : OPIC Support for Small Business Lending in Latin America Deborah Moronese, Insurance October.
PRO PREPA (Puerto Rico Electric Power Authority)
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 443 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Wastewater.
Transcripción de la presentación:

Head Offices: USA: NORTH MIAMI BEACH   FLORIDA 1835 NE Miami Gardens Dr, # 163 PHONE AUSTRIA: A 6850 Dornbirn, Austria, Mitterdorfgasse 1 PHONE: , Fax: , A 8020 Graz Austria, Puchstrasse 76 PHONE: , Fax: ,

Background: GOM was incorporated in 2009 with the aim to involve in the development of water and renewable energy projects by providing technical, legal and financial consultancy, direct project finance, procurement, project management and operation assistance.

References - Hydro Power: GOM was and is participating in several consortiums to acquire concessions for hydro power plants in Asia, Europe and Latin America. GOM was and is participating in several consortiums to acquire concessions for hydro power plants in Asia, Europe and Latin America. GOM is shareholder of SYNERGIA SA ( stock holding company in Bolivia, which has realized the Kanata Hydro Power Plant on the basis of the first IPP - Independent Power Producer - concession in Bolivia. GOM is shareholder of SYNERGIA SA ( stock holding company in Bolivia, which has realized the Kanata Hydro Power Plant on the basis of the first IPP - Independent Power Producer - concession in Bolivia. SYNERGIA has the status of an utility according to the new electricity law of Bolivia, which was promulgated 1995 within the sectorial reform of the state industry of Bolivia. SYNERGIA has the status of an utility according to the new electricity law of Bolivia, which was promulgated 1995 within the sectorial reform of the state industry of Bolivia. The involvement in SYNERGIA was the first Austrian participation in an IPP and BOO project in the infrastructural sector in Latin America. The involvement in SYNERGIA was the first Austrian participation in an IPP and BOO project in the infrastructural sector in Latin America.

References – Water: GOM is shareholder of STYRCON which is shareholder in AQUASYSTEMS doo - limited liability company in Slovenia. GOM is shareholder of STYRCON which is shareholder in AQUASYSTEMS doo - limited liability company in Slovenia. AQUASYSTEMS ( was awarded with the BOT concession contract for the wastewater treatment plant in Maribor, Slovenia. AQUASYSTEMS ( was awarded with the BOT concession contract for the wastewater treatment plant in Maribor, Slovenia. AQUASYSTEMS is led by SUEZ, the other shareholding companies are SUEZ and DEGREMONT from France, PETROL from Slovenia, PUT – PORR UMWELTTECHNIK and AQUA.NET-STEWEAG from Austria. AQUASYSTEMS is led by SUEZ, the other shareholding companies are SUEZ and DEGREMONT from France, PETROL from Slovenia, PUT – PORR UMWELTTECHNIK and AQUA.NET-STEWEAG from Austria.

GOM Technology GOM Technology GOM is providing leading expertise with the latest state of the art technology for GOM is providing leading expertise with the latest state of the art technology for Renewable Energy Renewable Energy –Hydro Power high head, medium head, low head lay out hydraulic structures, penstock engineering, geo- technical engineering, tunnelling and turbine technology –Biomass biofuels of the second generation biofuels of the second generation –Solar photovoltaic systems solar thermal systems Water Resources Management Water Resources Management Membrane based water treatment driven by solar and process saving energy sources Membrane based water treatment driven by solar and process saving energy sources

Sociedad Energética Industrial y Comercial Andina S.A. (SYNERGIA S.A.) 1993: Fundación como S.R.L. 1993: Fundación como S.R.L. 1995: Sociedad Accidental Synergia S.R.L. - Styrcon 1995: Sociedad Accidental Synergia S.R.L. - Styrcon 1997: Transformación en S.A. 1997: Transformación en S.A. Grupo Austriaco: 62% Grupo Austriaco: 62% Grupo Boliviano: 25% Grupo Boliviano: 25% Grupo Australiano: 13% Grupo Australiano: 13% Objetivo General: Explotación de recursos energéticos primarios y su transformación comercial Objetivos Específicos :  Construcción de la central hidroeléctrica Kanata  Identificación y desarrollo de nuevos proyectos de generación de energía Accionistas

Concepción general de aprovechamiento Uso de la energía potencial del agua del sistema hídrico de Escalerani en fuerza eléctrica, transformando este aprovechamiento en múltiple (agua potable y generación eléctrica) Uso de la energía potencial del agua del sistema hídrico de Escalerani en fuerza eléctrica, transformando este aprovechamiento en múltiple (agua potable y generación eléctrica) Caída no aprovechada por el sistema de agua Escalerani: Caída no aprovechada por el sistema de agua Escalerani: m.s.n.m m.s.n.m m (1110 m neto) Caudal promedio anual de la cuenca: Qa = 0.25 m 3 /seg Caudal promedio anual de la cuenca: Qa = 0.25 m 3 /seg Caudal de diseño: Qd = 0.8 m 3 /seg Caudal de diseño: Qd = 0.8 m 3 /seg

Fases del proyecto Organización de la empresa:1993 –1995 Organización de la empresa:1993 –1995 Solicitud de concesión – licencia:1995 – 1997 Solicitud de concesión – licencia:1995 – 1997 Estudios de factibilidad: Estudios de factibilidad: Financiamiento:1993 – 1997 Financiamiento:1993 – 1997 Diseño final: Diseño final: Licitación:1996 Licitación:1996 Construcción: enero 1997 – mayo 1999 Construcción: enero 1997 – mayo 1999 Puesta en marcha: mayo 1999 Puesta en marcha: mayo 1999

Estudios Synergia S.A.:Estudio de factibilidad Documentos de licitación Synergia S.A.:Estudio de factibilidad Documentos de licitación Diseño final Coordinación general. Aquaterra G.m.b.H. (Austria): Diseño tubería FoFo tramo alta presión. (UT - Graz, UT - Viena) Aquaterra G.m.b.H. (Austria): Diseño tubería FoFo tramo alta presión. (UT - Graz, UT - Viena) U.M.S.S. Lab. Geotecnia: Estabilidad macizo tramo 2 y 3 (tubería forzada). U.M.S.S. Lab. Geotecnia: Estabilidad macizo tramo 2 y 3 (tubería forzada). Estabilidad taludes de embalses

Financiamiento Costo del proyecto: $us Costo del proyecto: $us Fondos propios (Acciones): $us (32%) Fondos propios (Acciones): $us (32%) CREDITOS: $us (68%) CREDITOS: $us (68%) Bancos Austriacos: $us Créditos privados: $us Fondos de promoción CIDRE (Bolivia) $us E&CO (USA) $us Interés de los créditos: 9%-10% Interés de los créditos: 9%-10% Plazo: 7 años (Ampliado a años), 1.5 años de gracia Plazo: 7 años (Ampliado a años), 1.5 años de gracia Garantías: Garantías: Prendarias sobre los bienes y acciones Prendarias sobre los bienes y acciones Hipotecarias sobre acciones Hipotecarias sobre acciones Prendarias sobre equipos Prendarias sobre equipos

Características del proyecto Precipitación media anual: mm Precipitación media anual: mm Precipitación específica:12.5 l/s/Km 2 Precipitación específica:12.5 l/s/Km 2 Cuenca:34.8 Km 2 Cuenca:34.8 Km 2 Hidrología Ordovícico:Cuarcitas, lutitas, pizarras, areniscas Ordovícico:Cuarcitas, lutitas, pizarras, areniscas Cuaternario:Depósitos aluviales y coluviales Cuaternario:Depósitos aluviales y coluviales Geología

Características del proyecto Central hidroeléctrica de alta caída Central hidroeléctrica de alta caída 1210 m (La más alta en Sudamérica) 1210 m (La más alta en Sudamérica) Central de punta (producción en horas pico) Central de punta (producción en horas pico) Caudal promedio: 0.25 m 3 /s Caudal promedio: 0.25 m 3 /s Caudal de diseño:0.8 m 3 /s Caudal de diseño:0.8 m 3 /s Regulación diaria a través de embalses de compensación superior e inferior Regulación diaria a través de embalses de compensación superior e inferior Diseño

Provisión de equipo, construcción y montaje Equipo electro - hidromecánico Tuberías:Fierro FundidoTRM- Austria Tuberías:Fierro FundidoTRM- Austria AceroSULZER - España Equipamiento:SULZER – España Equipamiento:SULZER – España Transformador:OCREV - Italia Transformador:OCREV - Italia Equipo S/EABB - Suecia Equipo S/EABB - Suecia Construcción y montaje Construcción:SYNERGIA S.A. Construcción:SYNERGIA S.A. Unidad obras civiles Unidad obras civiles Unidad montaje Unidad montaje Supervisión:SYNERGIA S.A. Supervisión:SYNERGIA S.A.

Toma Turuni

Canal Escalerani- La Cumbre Embalse La Cumbre Canal Escalerani- La Cumbre Embalse La Cumbre

Canal de aducción La Cumbre- Cámara de Carga

Embalse de Compensación Superior

Tubería Forzada

Bloque de anclaje

Casa de Máquinas

Embalse de Compensación Inferior