CCRC08 post-mortem LHCb activities at PIC G. Merino PIC, 19/06/2008.

Slides:



Advertisements
Presentaciones similares
Hecho y Opinión 4.10J/ 5.10J
Advertisements

WALT: talking about dates and saying when your birthday is WILF: To be able to write & understand months and dates in Spanish to get to a Level 2 To be.
The future tense ESSENTIAL ?: How can I describe events that will happen in the future?
/1 R1 / Rafael Rodriguez Sistemas de Comunicaciones Móviles FACULTAD DE INGENIERIA U.C.V. Escuela de Ingeniería Eléctrica Design Guidelines for RF System.
PRUEBA DE UBICACION PARA HISPANOHABLANTES
SOCIEDAD PARA EL DESARROLLO REGIONAL DE CANTABRIA (SODERCAN) Knowledge Management tools Knowledge management tools.
Starter: stars and wishes. Learning objectives: To use a writing frame to construct new language and memory strategies to remember it Outcome: Approximately.
Por vs. Para La Clase de Español.
Telling Time.
What time is it? DLT: I can tell time in Spanish..
CPU 8088 vs. Pentium TEEL 4011 Prof. Jaime José Laracuente-Díaz.
To tell the time in Spanish… 3:15=Son las tres y quince. 11:20=Son las once y veinte. 6:04=Son las seis y cuatro. 1:30=Es la una y treinta 8:19=Son las.
Notes #18 Numbers 31 and higher Standard 1.2
Do Now! Hacer Ahora 1. Write homework in your planner. Escribe la preparación en su planificador. 2. SILENTLY complete the Do Now in your Weekly Work.
La hora. The traditional way to tell time in Spanish is by dividing the clock in half. The right side uses “y” to add minutes to the hour. Once the minute.
Quasimodo: (son las doce)
What has to be done today? It can be done in any order. Make a new ALC form Do the ALC Get two popsicle sticks Get 16 feet of yarn. That is 4 arms width.
ALC #7 Do the math problems and write the answer in Spanish.
Why do you need to learn English?  Schedule: Saturday: 8 a.m – 2:00 p.m – P609  Course book:  New Framework 2 pre-intermediate (units 1-6) - Richmond.
Definition
Nina Jackson, Presenter.  IMSCI is research based writing instruction.  IMSCI uses the gradual release of responsibility model to teach writing.  Scaffolds.
¿Qué haces en la escuela? Question words, objects, yo-go’s.
OBJECTIVO: SWBAT distinguish between greetings for people using tu and Ud. El 25 de Septiembre 2012.
La hora. The traditional way to tell time in Spanish is by dividing the clock in half. The right side uses “y” to add minutes to the hour. Once the minute.
A conocernos Gramática 1 Question formation Preview Sí or noSí or no No and not Question words.
Time Telling time is rather easy. You only need to know the numbers up to 59 to be able to tell the time.
¿Qué hora es? Telling Time en Español Telling Time in Spanish: ¿Qué hora es?= What time is it? I.When it is exacly on the hour, like 9:00, 4:00, 3:00.
Telling Time on the Hour If the hours are between 2 and 12, use “Son las …” Examples: 3:00 – Son las tres. 11:00 – Son las once. If the hour is within.
¿Qué hora es? The third-person singular of ser is used with one o’clock since it is just one hour (hora) Es la una. The singular.
Telling Time. When we ask what time it is in Spanish, we say “¿Qué hora es?”
Quasimodo Get out the clock worksheet to be checked and quietly study for your alphabet quiz.
The Future Tense -original PowerPoint created by Mrs. Shirley of North Intermediate High School in Broken Arrow, OK.
The spHPP MRM-DB: A database to support MRM assays Vital Vialas Fernandez – Bioinformatics UCM La Cristalera – Miraflores – 11/12/12.
TK Hemmick1 HBD Status TK Hemmick for the HBD group.
Capítulo 3, Paso 1. Cómo decir la hora  ¿Qué hora es?  When you ask the time, you’re using the verb ser, in the 3 rd person SINGULAR. Ser soy I somos.
JUEVES, EL 10 DE SEPTIEMBRE LT: I WILL RECOGNIZE SOME NEW VOCABULARY WORDS. Go over tests & retake procedures Interpretive Assessment: numbers & alphabet.
¿Qué hora es? What time is it? ¿Cómo decimos la hora en español?  Es la _______. Es is use for 1 o’clock only.  Son las ______. Son is used with all.
Numbers Spanish I Chapter 2. Numbers can be written in two ways: 1 wordtreintiuno 3 wordstreinta y uno.
Quasimodo: Correct the sentences Yo compro lo. ▫Yo lo compro. Ellos quieren las comprar. ▫Ellos quieren comprarlas. Nosotros estamos leiendolo. ▫Nosotros.
By Jimmy Wendt, Mike Kalis, and Craig Wocl.  In 2005, Carlos Beltran signed a 7 year, $119 million contract to play with the New York Mets  At the time,
ON YOUR DESK Documento Today’s notes Homework. ¡Hola! Conjugate the following verbs: 1. Yo / comer 2. Él / bailar 3. Nosotros / vivir 4. Ellos / abrir.
Vámonos Fill the blank with the SUBJECT of the sentence (there may be more than one right answer, you only have to choose one). Write out the sentence.
Please sit in your assigned seat. Take out your homework from last class (decode the message). Silently complete the “warm up” section of your paper.
Las Horas del Día hora hora o’clock §The word hora means time in asking the time of the day. In standing time the word hora is understood. There is not.
¿Qué hora es? ¿Qué hora es? What time is it? ¿A qu é hora …? At what time…?
What time is it? DLT: I can tell time in Spanish..
Un juego de adivinanzas: ¿Dónde está el tesoro? A1B1C1D1E1F1 A4B4C4D4E4F4 A2B2C2D2E2F2 A5B5C5D5E5F5 A3B3C3D3E3F3 A6B6C6D6E6F6 Inténtalo de nuevo Inténtalo.
Campana #2 Hoy es juves, 3 de septiembre Use your notas on Frases Importantes. Translate each phrase. Escribe the Spanish version only. 1. What’s your.
The time.  ¿Qué hora es? What time is it?  Es la.../Son las… It is…o’clock To say at what time something happens use:  ¿A qué hora es…? At what time.
Spanish II Week 8. Para Empezar El 28 de septiembre Por favor, responde a la pregunta en una frase completa: ¿Tienes la clase de biología este año?
English Language II (2). English Language I (2) Warm-up.
Facilidades de Análisis en los centros: ATLAS TIER3 en Valencia S. González de la Hoz, J. Sánchez, L. March, A. Lamas IFIC – Instituto de Física Corpuscular.
Objetivo y Agenda Hoy es lunes 9 de noviembre de 2015 Objetivo: I will be able to read a short story and talk about it using past tenses. Agenda: Porcentajes.
100 Book Challenge Desafío de leer 100 libros. Cada niño tendrán: Una bolsa de libros Una carpeta 2 libros para leer cada noche Un informe de lectura.
Español 2 lunes el 21 de septiembre Daily Warm Up (pick up a new sheet) Test Review Activities: – Pizzaras Blancas (white boards) – SINGO – Toca las estrellas.
Campanada guidelines in your composition notebook ¿Cómo es tu familia? (10 points) Ex. Hoy es Miercoles el 27 de enero First line will start with the date.
Escribir *You can get creative. You can write in the first person which means you are the character, you can use the third person which means you are talking.
Martes, 4 de octubre WALT: how to tell the time in Spanish WILF: to be able to understand and begin to say the time in Spanish Can you match these times.
EQUILIBRIUM OF A PARTICLE IN 2-D Today’s Objectives: Students will be able to : a) Draw a free body diagram (FBD), and, b) Apply equations of equilibrium.
Español 3 24 de febrero de 2017.
¿Qué hora es?.
First Grade Dual High Frequency Words
Quasimodo: Tienes que hacer parte D de la tarea..
Telling Time (¿Qué hora es?).
Para el fin de esta leccíon, se puede:
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Astronomy has really big numbers. Distance between Earth and Sun meters kilometers This is the closest star.
Transcripción de la presentación:

CCRC08 post-mortem LHCb activities at PIC G. Merino PIC, 19/06/2008

2 LHCb Computing Main user analysis supported at CERN + 6Tier-1s Tier-2s essentially MonteCarlo production facilities

3 CCRC08: Planned tasks May activities: Maintain equivalent of 1 month data taking assuming a 50% machine cycle efficiency Raw data distribution from pit → T0 centre Raw data distribution from T0 → T1 centres –Use of FTS - T1D0 Recons of raw data at CERN & T1 centres –RAW (T1D0)  rDST (T1D0) Stripping of data at CERN & T1 centres –RAW & rDST (T1D0)  DST (T1D1) Distribution of DST data to all other centres –Use of FTS - T0D1 (except CERN T1D1)

4 Activities across the sites Planned breakdown of processing activities (CPU needs) prior to CCRC08 SiteFraction (%) CERN14 FZK11 IN2P325 CNAF9 NIKHEF/SARA26 PIC4 RAL11

5 Tier 0  Tier 1 FTS from CERN to Tier-1 centres –Transfer of RAW will only occur once data has migrated to tape & checksum is verified –Rate out of CERN ~35MB/s averaged over the period –Peak rate far in excess of requirement In smooth running sites matched LHCb requirements

6 Tier 0  Tier 1

7 Issue with UK certificates CERN outage CERN SRM endpoint problems Restart IN2P3 SRM endpoint To first order all transfers eventually succeeded –plot shows efficiency on 1st attempt…

8 Reconstruction Used SRM 2.2 –LHCb space tokens are: LHCb_RAW (T1D0); LHCb_RDST (T1D0) Data shares need to be preserved –Important for resource planning Input 1 RAW file & output 1 rDST file (1.6 GB) Reduced nos of events per recons job from 50k to 25k (job ~12 hour duration on 2.8 kSI2k machine) –In order to fit within the available queues –Need to get queues at all sites that match our processing time Alternative: reduce file size!

9 Reconstruction After data transfer file should be online, as job submitted immediately –NOTE: in principle only LHCb has this requirement of “online reconstruction”  Reco jobs will read the input data from the T1D0 write buffer Just in case… LHCb pre-stages files (srm_bringonline) & then checks on the status of the file (srm_ls) before submitting pilot job via GFAL –Pre-stage should ensure access availability from cache –Only issue at NL-T1 with reporting of file status

10 Reconstruction 41.2k reconstruction jobs submitted 27.6k jobs proceeded to done state Done/created ~67% Sub jobs Done jobs Done/ Sub NIKHEF10.3k (26%) 2.3k (6%) 23%  PIC1.8k (4%) 1.6k (4%) 89% RAL4.7k (11%) 3.5k (8%) 74% CERN6.1k (14%) 5.3k (13%) 86% CNAF3.9k (9%) 2.8k (7%) 72% GridKa4.1k (11%) 3.1k (7%) 76% IN2P310.3k (25%) 6.1k (14%) 56% 

11 Reconstruction 27.6k reconstruction jobs in done state –21.2k jobs processed 25k events –Done/25k events ~77% 3.0k jobs failed to upload rDST to local SE –Only 1 attempt before trying Failover –Failover/25k events ~13% 25k events Fail upload Success /Created NIKHEF1.2k (53%) 0.9k (70%) 4% PIC1.6k (99%) 0.0k (0%) 89% RAL3.1k (89%) 0.0k (1%) 68% CERN5.2k (100%) 0.7k (14%) 76% CNAF2.6k (95%) 0.0k (1%) 67% GridKa3.0k (99%) 0.7k (22%) 58% IN2P35.1k (90%) 0.7k (14%) 43%

12

13  Error humano en el PIC: WN con la red desconfigurada de Mayo Hacía de black-hole (ticket-4386)

14 Reconstruction CPU efficiency: ratio of wall/cpu time on running jobs CNAF: more jobs than cores on a WN … IN2P3 & RAL: Problems reading input data

15 Reconstruction CPU efficiency: ratio of wall/cpu time on running jobs PIC: The most cpu-efficient T1

16 dCache Observations Official LCG recommendation p3 LHCb ran smoothly at half of T1 dCache sites –PIC OK - version p6 (dcap) –GridKa OK - version p2 (dcap) –IN2P3 - problematic - version p6 (gsidcap) Seg faults - needed to ship version of GFAL to run Could explain CGSI-gSOAP problem???? –NL-T1 - problematic (gsidcap) Many versions during CCRC to solve number of issues > p3-> p4

17 Databases Conditions DB used at CERN & Tier-1 centres –No replication tests of conditions DB Pit ↔Tier-0 (and beyond) –Switched to using Conditions DB 15th May for reconstruction LFC –Use “streaming” to populate the read-only instance at T1 from CERN –Problem with CERN instance revealed local instances not being used by LHCb! Testing underway now

18 Stripping Stripping on rDST files 1 rDST file & associated RAW file Space tokens: LHC_RAW & LHCb_rDST DST files & ETC produced during the process stored locally on T1D1 (add storage class) Space tokens: LHCb_M-DST DST & ETC file then distributed to all other computing centres on T0D1 (except CERN T1D1) Space tokens: LHCb_DST (LHCb_M-DST)

19 Stripping 31.8k stripping jobs were submitted 9.3k jobs ran to “Done” Major issues with LHCb book-keeping SubmDone CERN2.4k2.3k CNAF2.3k2.0k GridKa2.0k IN2P34.5k0.2k NIKHEF0.3k<0.1k PIC1.1k RAL2.2k1.6k Failed to resolve datasets 17.0k

20 Stripping: T1-T1 transfers Stripping test limited to 4 T1 centres CNAFPIC GridKaRAL Initial problems uploading to M-DST Token at PIC Catch up ok once solved

21 Conclusiones A pesar de ser el Tier-1 más pequeño de LHCb, la calidad de servicio del PIC ha sido la más alta en el CCRC08 Se han testeado los siguientes procesos para los Tier-1 –Recepción de datos desde el CERN –Reconstrucción –Stripping y envío de DST a otros Tier-1 Los resultados en el PIC han sido positivos –Recepción de datos desde el CERN (~5MB/s) –Lectura de datos desde WNs (dcap) – OK –Demostrada replicación de DST a otros Tier-1s a más velocidad de la requerida (catch-up) El ejercicio ha sido también útil para que LHCb detecte los puntos débiles de su infraestructura Grid DIRAC –Mejorar el sistema de book-keeping, log-files, etc