Aggregate Planning Determine the quantity and timing of production for the immediate future Objective is to minimize cost over the planning period by adjusting.

Slides:



Advertisements
Presentaciones similares
PLT EXPERIENCES IN SPAIN
Advertisements

RM EXPORT CORPORATION. Director Dirección General Mexican Management Gerencia México Purchases Compras Design Diseño Local Sales Ventas Nacionales IT.
Unifying Concepts and Processes in Science. Explanatory Framework Across Science Disciplines Science is a way of knowing, a process--- it is a systematic.
SECRETARÍA DE ESTADO DE CAMBIO CLIMÁTICO DIRECCION GENERAL DE CALIDAD Y EVALUACION AMBIENTAL PRESENTATION BY SPAIN TO THE EXECUTIVE BODY FOR THE CLRTAP:
A t r e v e t e a s e r D i f e r e n t e
TOWARDS A NEW ECONOMIC BILL Héctor Silva Meeting - Breakfast September 16, 2009.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco RENAISSANCE - ZARAGOZA - SPAIN 1.
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 WP 1.5 Description of work (month.
4 Mayo, 2006 CETA Miguel Cárdenas Montes CETA-CIEMAT Centro Extremeño de Tecnología Avanzada CETA.
© 2006 XBRL International, All Rights Reservedwww.xbrl.org/Legal Ignacio Hernández-Ros Technology development XBRL International Using XQuery to process.
Action Plan Template Intel ISEF 2009 Educator Academy May 2009
Grupos de Trabajo 6 - Informe Working Group 6 – Report Transparency.
Grupos de Trabajo # 7 - Informe Working Group # 7 – Report General Business and Operational Risks.
La entrevista Mosaicos, pp. 325, 355. After her positive experience at the job fair, Malena has decided to go for an interview for a position in perfume.
You have already learned that ser and estar both mean to be but are used for different purposes. These charts summarize the key differences in usage between.
La Gramática Capítulo 5.
2003 HYPACK MAX Training Seminar1 Sample Case la Entrada manual de Datos de la Línea de la costa El Metodo de MANUAL –DIG Objectos –Boya (Roja)
2003 HYPACK MAX Training Seminar1 Sample Belgium Test Inputting Tag Line information into HYPACK® MAX In the old days, a Tag Line was anchored to.
Game Cluedo: How to Play 1.Your group should have the 21 cards containing 6 cards of suspects, 9 rooms and 6 weapons, a tally card for each member and.
Conceptos Básicos del lenguaje de programación COBOL
Ser and Estar To be or not to be? Spanish 3 (H) ch.3.
Ser and Estar To be or not to be? Spanish One ch.2B.
Arquitectura de Computadores I
Time Expression with Hacer
Direct and Indirect Object Pronouns
Copyright © 2008 Vista Higher Learning. All rights reserved You have already learned that ser and estar both mean to be but are used for different.
Iberoamerican National Institutes Network of Engineering and Hydraulic Research Roundtable Manuel Echeverria CEDEX Spain Millenium Development Goals on.
Departamento Administrativo de Ciencia, Tecnología e innovación Colciencias República de Colombia VII Ordinary Meeting of the COMCYT Working Group Technological.
1. My dad likes Match of the Day because he loves football. 2. My older sister loves X Factor because she likes singing. 3. My mum likes Come Dine with.
Referencias Diciembre 2010 Desmex – Sistemas Solares Térmicos.
Table of Contents Help How to Find Clip Art How to Export Clip Art How to Print Clip Art Talk About Activities UNIDAD 1 Lección 1 andar en patineta alquilar.
3rd Grade 2 nd Six Weeks Science Unit 3, Lesson 2 CScope Vocabulary Words
Page 363 Avancemos 3. In ENGLISH the past perfect describes actions that HAD occurred BEFORE other actions in the past. We had already eaten when she.
Realidades 2A ¿ Cómo te preparas?.
Gestión de la Informacion– Siguiente paso? Ken Reid Head of International Technical Relations EUROCONTROL.
M ATERIAL DE CONTINGENCIA INGLÈS 4 TO AÑO TODAS LAS SECCIONES Prof. Emily Chávez.
(por favor) By emory gibson Para describir how long ago en español, presta attencion.
Su Negocio Conectado. VisibilidadVisibilidad ColaboraciónColaboración PlanificaciónPlanificación EjecuciónEjecución Build Connections.
para desarrolladores Minimizar el cambio Concentrarse en estabilidad, confiabilidad y rendimiento. Ayudar a mejorar la productividad Reducir la curva.
Departamento de Ing. Electrónica Circuitos Digitales II Universidad de Antioquia Departamento de Ing. Electrónica Circuitos Digitales II Universidad.
Telling time in Spanish: Explanation Practice exercise index McCarron.
La Lección del Repaso Antes de entrar en la clase de Español IV, necesita saber esta información.
SISTEMA DE INFORMACIÓN RETO DE NEGOCIOS SOLUCIONES DE NEGOCIOS ADMINISTRACIÓN TECNOLOGÍA DE LA INFORMACIÓN ORGANIZACIÓN SOSTENER LA VENTAJA COMPETITIVA.
Write out the following conversation in the correct order:
Articles, nouns and contractions oh my!. The POWER of the article THE 1. There are four ways to express THE in Spanish 2. The four ways are: El La Los.
1 USMP PhD in Information Systems Engineering INFRASTRUCTURE MANAGEMENT - IM The Information and Communications Technology Infrastructure Management (ICT-IM)
1 USMP PhD in Information Systems Engineering INFRASTRUCTURE MANAGEMENT - IM The Information and Communications Technology Infrastructure Management (ICT-IM)
“La comprensión interdisciplinaria es la capacidad de integrar conocimientos y formas de pensar de dos o más disciplinas para crear una nueva perspectiva.
© 2013 Board of Regents of the University of Wisconsin System, on behalf of WIDA.
 Making complete sentences How to make complete sentences in Spanish. The following presentation is designed to help you learn how to do the following:
M ATERIAL DE CONTINGENCIA INGLÉS 4 TO AÑO TODAS LAS SECCIONES Prof. Emily Chávez.
 1. Why should a person learn Spanish? Give at least 3 reasons in your explanation.  2. What Spanish experiences have you had? (None is not an option.
Negatives and Questions. Negatives Consider the following sentences: Juan estudia mucho. Marta y Antonio viven en Georgia. Rita y el chico necesitan.
Derechos de Autor©2008.SUAGM.Derechos Reservados Sistema Universitario Ana G. Méndez División de Capacitación Basic Quality Tools CQIA Primer Section VII.
Quantity How much? How many?
Social Networks and Parent Teacher Meetings: A Question that can´t Wait Molina, M.D., Rodríguez, J., Collado, J.A. y Pérez, E. University of Jaén (SPAIN)
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 3 Brief Description: Treated wastewater will be reused for irrigation and industrial uses in Northwest.
Santiago de Chile January 2012 Roundtable 6: Lobby regulation János Bertók Head of Public Sector Integrity Division Organización para la cooperación.
Preguntas Esenciales 1.What are essential questions? What are their purpose in learning? 2.Look over the essential questions and think about how they might.
(c) P. Gomez-Gil, INAOEP DISEÑO DE SOFTWARE 2ª. parte NOTAS DEL CURSO Ingeniería de Software I DRA. MARIA DEL PILAR GÓMEZ GIL INAOEP Versión:
Notes #20 Notes #20 There are three basic ways to ask questions in Spanish. Can you guess what they are by looking at the photos and photo captions on.
Español 1 6 y 7 de noviembre de 2013.
Ser y Estar To be or….to be?
JKSimMet Software (windows & buttons) Split Engineering Chile Ltda. General Salvo #331 oficina 201 Casilla Sucursal Panorámico Providencia – Santiago,
Indirect Questions First Day on the Job 11 Focus on Grammar 4 Part X, Unit 28 By Ruth Luman, Gabriele Steiner, and BJ Wells Copyright © Pearson Education,
Setting SMART Goals If goals aren’t reachable, they aren’t worth making. All you have to do to set realistic goals is follow the SMART goals guidelines.
Welcome to PowerPoint gdskcgdskfcbskjc. Designer helps you get your point across PowerPoint Designer suggests professional designs for your presentation,
The causative is a common structure in English. It is used when one thing or person causes another thing or person to do something.
Lean Six Sigma Methodology.
Integrated Management System
Transcripción de la presentación:

Planificación Agregada MPS y MRP en manufactura Dr. Walter López Moreno

Aggregate Planning Determine the quantity and timing of production for the immediate future Objective is to minimize cost over the planning period by adjusting Production rates Labor levels Inventory levels Overtime work Subcontracting Other controllable variables Heizer 2010

Aggregate Planning Figure 13.2 Heizer 2010 Product decisions Marketplace and demand Research and technology Product decisions Process planning and capacity decisions Aggregate plan for production Demand forecasts, orders Raw materials available External capacity (subcontractors) Workforce Inventory on hand Master production schedule and MRP systems Detailed work schedules Figure 13.2 Heizer 2010

The Planning Process Long-range plans (over one year) Research & Development New product plans Capital investment Facility location/expansion Intermediate-range plans (3 to 18 months) Sales planning Production planning and budgeting Setting employment, inventory, subcontracting levels Analyzing cooperating plans Short-range plans (up to 3 months) Job assignments Ordering Job scheduling Dispatching Overtime Part-time help Top executives Operations managers Operations managers, supervisors, foremen Responsibility Planning tasks and horizon Figure 13.1 Heizer 2010

The Planning Process Figure 14.1 Management Return on investment Capital Engineering Design completion Aggregate production plan Procurement Supplier performance Human resources Manpower planning Production Capacity Inventory Marketing Customer demand Finance Cash flow Master production schedule Change production plan? Figure 14.1 Heizer 2010

The Planning Process Figure 14.1 Master production schedule Change master production schedule? Material requirements plan Change capacity? Change requirements? No Capacity requirements plan Is execution meeting the plan? Is capacity plan being met? Realistic? Execute capacity plans Yes Execute material plans Figure 14.1 Heizer 2010

Objectives of master production scheduling are: ● To provide top management with a means to authorize and control manpower levels, inventory investment, and cash flow ● To coordinate marketing, manufacturing, engineering, and finance activities by a common performance objective ● To reconcile marketing and manufacturing needs ● To provide an overall measure of performance ● To provide data for material and capacity planning Kerzner 2010

Master Production Schedule (MPS) Specifies what is to be made and when Must be in accordance with the aggregate production plan Aggregate production plan sets the overall level of output in broad terms As the process moves from planning to execution, each step must be tested for feasibility The MPS is the result of the production planning process Heizer 2010

Master Production Schedule (MPS) MPS is established in terms of specific products Schedule must be followed for a reasonable length of time The MPS is quite often fixed or frozen in the near term part of the plan The MPS is a rolling schedule The MPS is a statement of what is to be produced, not a forecast of demand Heizer 2010

Master Production Schedule (MPS) Can be expressed in any of the following terms: A customer order in a job shop (make-to-order) company Modules in a repetitive (assemble-to-stock) company An end item in a continuous (make-to-stock) company Heizer 2010

MRP Structure Figure 14.5 Data Files Output Reports BOM Master Purchasing data BOM Lead times (Item master file) Inventory data Output Reports MRP by period report MRP by date report Planned order report Purchase advice Exception reports Order early or late or not needed Order quantity too small or too large Master production schedule Material requirement planning programs (computer and software) Figure 14.5 Heizer 2010

Benefits of MRP Better response to customer orders Faster response to market changes Improved utilization of facilities and labor Reduced inventory levels Heizer 2010

Bills of Material List of components, ingredients, and materials needed to make product Provides product structure Items above given level are called parents Items below given level are called children Heizer 2010

Packing box and installation kit of wire, bolts, and screws BOM Example Product structure for “Awesome” (A) A Level B(2) Std. 12” Speaker kit C(3) Std. 12” Speaker kit w/ amp-booster 1 E(2) F(2) Packing box and installation kit of wire, bolts, and screws Std. 12” Speaker booster assembly 2 D(2) 12” Speaker G(1) Amp-booster 3 Heizer 2010

Lead Times The time required to purchase, produce, or assemble an item For purchased items – the time between the recognition of a need and the availability of the item for production For production – the sum of the order, wait, move, setup, store, and run times Heizer 2010

Dibujo de Ensamblaje (Engineering Drawing) Lopez 2009

Estructura del Producto del Bill of Material Lopez 2009

Plan Agregado y el Itinerario Maestro de Producción (MPS – Master Production Schedule)

Entradas al MRP (Material Requirement Planning) utilizando informes del BOM, Compras, Inventario y los tiempos de espera (Lead Times) Lopez 2009

BOM Lopez 2009

Inventario Quantity on hand – Es el inventario que esta disponible en el almacén. WIP – Material que esta en proceso de producción. Cantidad en el piso – Piezas sin labor que están disponibles y asignadas (comprometidas) para la produccion. En algunos casos forman parte de un sistema de KANBAN.

Inventario Lopez 2009

Compras Planned order Receipt – son los materiales que se planifican comprar de acuerdo a las futuras necesidades. En producciones que estan en proceso los ordenes deben estar en itinerario por recibir (Planned schedule receipt) Planned order Release – Son las ordenes que se planifican con el suplidor para las fechas de recibo físicamente en las instalaciones. Estas dependen del lead time. Lopez 2009

Compras Lopez 2009

Requerimientos netos Lopez 2009

Requerimientos netos Lopez 2009

Requerimientos netos Lopez 2009

Tabla del plan de Ordenes de Envío (Release) y Recibos (Receipt) Lopez 2009

Tabla del plan de Ordenes de Envío (Release) y Recibos (Receipt) Lopez 2009

Haga la semana 2, 3 y 4 con los siguientes datos Lopez 2009

Referencias Heizer/Render (2010) Principles of Operations Management, 6e Operations Management Kerzner Harold, (2010) Project Management , A systems approach to planning, scheduling and control López Walter, (2009) Proceso de planificación en manufactura