1 PETE 411 Well Drilling Lesson 31 Plugback Cementing.

Slides:



Advertisements
Presentaciones similares
Mr. Redaelli OnlineTaco.com. To Have - Tener Yo tengo – I have Tú tienes – You have (Informal) Usted tiene – You have (Formal) El tiene – He has Ella.
Advertisements

Adverbs Mosaicos, p. 138.
el plato-plate el tenedor-fork la cuchara-spoon el cuchillo-knife el vaso-cup la servilleta-napkin la cuenta-bill.
 Making complete sentences How to make complete sentences in Spanish. The following presentation is designed to help you learn how to do the following:
Dónde vs. Adónde Dónde means WHERE. When dónde is used, it is usually in relation to where someone IS LOCATED RIGHT THEN. Ex: ¿Dónde estás tú? Yo estoy.
Past participles used as adjectives
La Hora... Telling Time in Spanish. ¿Que hora es? The verb ser is used to express the time of day. Use es when referring to "one o'clock" and use son.
Telling Time.
Tu Día Escolar Español 2 Tema 1 Página 40.
Los números Los números. 16  29  numbers 16  29 have two options  17 = diez y siete or diecisiete  (z  c)(y  i)  24 = veinte y cuatro orveinticuatro.
DIRECT OBJECT PRONOUNS. DIRECT OBJECTS The object that directly receives the action of the verb is called the direct object. Mary kicked the ball. "Ball"
What has to be done today? It can be done in any order. Make a new ALC form Do the ALC Get two popsicle sticks Get 16 feet of yarn. That is 4 arms width.
ALC #7 Do the math problems and write the answer in Spanish.
Digital Photography: Selfie Slides
Definite & indefinite articles
Las Preguntas (the questions) Tengo una pregunta… Sí, Juan habla mucho con el profesor en clase. No, Juan no habla mucho en clase. s vo s vo Forming.
Time in Spanish Nivel 1. Telling time inSpanish  Time is not TOO different in Spanish.  It is formatted the way time used to be told in English.  It.
El uso de los adjetivos The Use of Adjectives Adjectives describe nouns. In Spanish they must agree with the noun described in two ways…………
Un juego de adivinanzas: ¿Dónde está el tesoro? A1B1C1D1E1F1 A4B4C4D4E4F4 A2B2C2D2E2F2 A5B5C5D5E5F5 A3B3C3D3E3F3 A6B6C6D6E6F6 Inténtalo de nuevo Inténtalo.
English Language II (2). English Language I (2) Warm-up.
¿Qué película has visto? Español 2 Ch 6B. Cápitulo 6B Vocabulario.
¿Cuánto tiempo hace que…? You can ask when something happened in Spanish by using: ¿Cuándo + [preterit verb]…? ¿Cuándo llegaste a la clínica? When did.
Affirmative and Negative Words P. 31 Realidades 2.
The gastronomy of Brazil includes a great variety of dishes and flavors, among which we can classify three major influences: The indigenous, the European.
Who was Isaac Newton? Sir Isaac Newton ( ), an English scientist and mathematician famous for his discovery of the law of gravity, also discovered.
EQUILIBRIUM OF A PARTICLE IN 2-D Today’s Objectives: Students will be able to : a) Draw a free body diagram (FBD), and, b) Apply equations of equilibrium.
Agenda: Boot verbs and jugar. La Familia. Tener: Quack Video
Las clases de Sra. Schwarz Realidades 1
Description Sentences
Reglas para los números
Gustar V. Encantar.
Español 2 2 de mayo de 2017.
(How to tell time in Spanish)
PREGUNTAS: Questions and Question Words
Español 1 11 de mayo de 2017 Good morning, thank you for taking my classes today. For the most part the kids are really great. Here is my schedule for.
JUGAR to play a sport or a game
Ser and Adjectives.
First Grade Dual High Frequency Words
Apuntes: Los Adjetivos
Los números.
Telling Time (Cómo decir la hora).
¿Qué hora es?.
Youden Analysis. Introduction to W. J. Youden Components of the Youden Graph Calculations Getting the “Circle” What to do with the results.
ELECTROMAGNET Gregory Miguel Concuan Motta Ana Belén Guerra Marroquín Brayan Stid Ortiz Sosa.
33. Directional DrillingPETE Well DrillingSlide 1 PETE 411 Well Drilling Lesson 33 Directional Drilling.
Faults in Cake Making GCSE Revision. It is often the case that cakes are made which are not up to the required standard. When this happens, it is important.
Genentech A Discussion Winter 2018Joseph Milner, RSM54011.
11. PRACTICAL CASE EXAMPLE
Page 86 Realidades 2 Ser Vs. Estar.
PREGUNTAS: Questions and Question Words
Los números.
The present tense of ir and jugar
Quasimodo: Tienes que hacer parte D de la tarea..
Quasimodo: Tienes que hablar con un amigo en español sobre tu rutina diaria (daily routine). Debes usar las preguntas de ayer.
Forming questions.
Apuntes: La hora Lección 1: Hola, ¿Qué tal?.
“HACE + TIME + QUE” EXPRESSIONS
Bellringer 10/29 Put this in your NOTES!!! Using questions that you know in Spanish, figure out what the following question words mean. If you can’t.
NEUMÁTICOS AGRÍCOLAS EL LIDER EN EL CAMPO.
Telling Time (La hora).
Telling Time in Spanish
VECTOR: Conjuction of 2 parameters: Module: Quantity, actual value, dimension Direction: “Where is it going to or coming from”
Description Sentences
LOS VERBOS  --ar en el presente.
Astronomy has really big numbers. Distance between Earth and Sun meters kilometers This is the closest star.
How much? - How many? English Grammar. When we want to know the quantity or amount of something, we ask questions starting with How much and How many.
The causative is a common structure in English. It is used when one thing or person causes another thing or person to do something.
Globalization Politics and the preservation of nation state.
Las Preguntas (the questions) Tengo una pregunta… Sí, Juan habla mucho con el profesor en clase. No, Juan no habla mucho en clase. s vo s vo Forming.
Transcripción de la presentación:

1 PETE 411 Well Drilling Lesson 31 Plugback Cementing

2 Plugback Cementing  Case I: No Spacer  Case II: Equal Height Spacers  Case III: Spacer Ahead of Cmt. (only)  Case IV: Two Unequal Spacers  Mixtures and Solutions

3 Read: Applied Drilling Engineering Ch. 3. Cementing HW #16 Due November 22, 2002

4 Balanced Cement Plug Fig Placement technique used for setting cement plug.

5 Cementing (Open-Hole Plugging) 1. Plug-back for abandonment 2. Plug-back for fishing or hole deviation  Open-hole plugging is usually performed with “slick” drillpipe or tubing.  In some cases, reciprocating scratchers may be run to enchance cement bonding.

6 Types of Balanced Plugs Case I: No water or other fluid of different density from that in the hole is run ahead or behind the cement slurry. Case II: Water or other fluid of different density from that hole is run ahead and behind cement slurry. The volume of fluid ahead and behind slurry is calculated so that height in casing is same as height inside the string.

7 Displacement Case III: Water or other fluid of different density from that in the hole is run ahead of cement slurry and hole fluid only is used as displacing fluid. Case IV: Water or other fluid of different density from that in the hole is run ahead and behind cement slurry. In this case, the heights of fluid in annulus and drill string are not equal.

8 Case I C Height of plug after pulling pipe Height of plug with pipe in place T

9 Case I CT HFinal Height

10 Example Balanced Plug - Case I Set a balanced cmt. plug from 8,500-9,000 ft, with no fluid spacers. 1. Open hole diameter = 10 3/4” 2. Assume no washout 3. Use 5”, #/ft DP, open ended 4. Use class H cement, 15.6 #/gal

11 Example - Case I (a) Calculate volume of cement slurry required: DHDH L

12 Example - Case I (b) Calculate actual height of plug when DP is in place at 9,000 ft. If then CT = Height of Plug, with Pipe in place

13 Example - Case I (b) cont’d In this case, ( Halliburton Book )

14 Example - Case I (b) cont’d

15 Example - Case I (c) Determine the quantity of mud displacement inside the DP that will ensure a balanced plug. Balance requires that the pressures be equal inside the DP and in the annulus, at 9,000’. P D P A h MD = h MA

16 Example - Case I

17 Example - Case I V Displ = bbl (of mud) Volume of mud displacement (behind the cement slurry) = 8,469 ft * ft 3 /ft

18 Example - Case I Also required: Class H cement req’d Mix water req’d

19 mud water cement water mud Case II hWhW Height of plug after pulling pipe h WD = h WA Height of plug with pipe in place

20 Example, Balanced Plug - Case II Set a balanced plug, 500 ft high, with its bottom at 9,000 ft. Use water spacers of equal height inside DP and in annulus. Volume of annular water spacer = 10 bbl Open hole diameter = 10 3/4”. No washouts 5” DP, #/ft, open ended. Use class H cement, 15.6 #/gal

21 Example - Case II (a) & (b) From previous example:

22 Example - Case II (c) Calculate height (length) of water spacer in DP: In annulus,

23 Example - Case II (d) Volume of water spacer inside DP V W,DP … for spacers of equal height V W,DP = 2.02 bbls

24 Example - Case II (e) A balanced plug requires that P D P A

25 Example - Case II (e) cont’d

26 Example - Case II Volume of mud required to displace cement and spacers = ft 3 V Displ = bbls

27 Check

28 Pumping Sequence: 1. Water spacer for annulus: 10 bbls 2. Cement Slurry for Plug: 3. Water spacer behind cement: 2.0 bbls

29 Pumping Sequence 4. Mud displacement behind second water spacer: bbls Total fluid pumped = = bbls (at 10 bbl/min this would require ~22 min)

30 Case III Hole fluid density > density of water Hydrostatic heads in DS and annulus must balance at top of cement slurry with DS in hole. hWhW Height of plug after pulling pipe Height of plug with pipe in place 0

31 Case IV - General Case Hole fluid density is greater than water density. Hydrostatic heads in DS and annulus must balance at top of cement slurry with DS in hole.

32 Procedure in setting balanced plug 1. Run drillpipe in to depth where plug is to be set; in this case 9,000 ft. (open ended). 2. Circulate and condition mud one complete circulation to make sure system is balanced. 3. Pump spacers and cement per calculations and displace w/proper amount of fluid

33 Procedure in setting balanced plug 4. Stop pumps; break connection at surface. A. If standing full, plug is balanced. B. If flowing back, a mistake in calculations has been made. Stab inside BOP, or have a slug of heavy mud ready to pump.

34 Procedure in setting balanced plug 5. Once the end of the drillpipe clears the plug, there is a good chance the pipe will pull wet. This is because pressures have gone back into a completely balanced mud system. 6. If pulling wet, slug pipe and pull out of hole.

35 Procedure in setting balanced plug 7. Even if plug is severely out-of-balance, never try to reverse cement out of hole. 8. Tag plug with DP at end of 8 hours. If too high, plug may have to be drilled out and another plug spotted. If too low, spot another plug to required height with DP just above top of first plug.

36 Calculations to Design a Balanced Open Hole Cement Plug 1. Calculate cu. ft. of slurry required for plug in open hole. 2. Multiply this volume by excess factor (50% excess factor = 1.50)

37 When dealing with a washed-out hole, where an excess factor is required, it is usually easier to calculate a new, effective hole size, and use that instead of the excess factor. Calculations for balanced plug - HINT If 50% excess is required Use d 2 for calculations This is the effective dia.

38 Calculations for balanced plug 3. Find height (h, ft) cement will occupy when drillpipe is at bottom of plug during pumping:

39 Calculations for balanced plug - cont’d 4. Find height (ft) water spacer ahead of cement will occupy in annulus. Use d 2 to calculate this (to account for the excess factor). 5.Find height (ft) water spacer behind cement will occupy in DP. Do not use excess factor. 6. Pressures must balance at bottom of plug

Convert this mud to feet inside DP. Calculations for balanced plug - cont’d

41 9. Convert this footage to bbls inside DP for proper displacement. 10. To find sks cmt required, divide volume, V 2, by yield/sk. This yield, Y sk, may be in the Halliburton tables (or may not…). Number of sx req’d, Calculations for balanced plug - cont’d

If yield not shown, calculate from formula for mixtures. Solve for in this formula. Add the V’s for yield. 12. Total mix water will be times number of sacks. V W total = ( V W / sk ) * N Calculations for balanced plug - cont’d