SIMBA Automation and Remote Control Why automation? -Increase safety and efficiency -Reduce mining production costs Why remote control? -To take the most.

Slides:



Advertisements
Presentaciones similares
Telling time in Spanish: Explanation Practice exercise index McCarron.
Advertisements

Editing Slides With Polaris Office, you can create new .ppt and .pptx presentations or edit your presentation with ease.
CATEDRA PAVASAL I Congreso Internacional sobre Liderazgo: “El Liderazgo Europeo de la Comunidad Valenciana en Infraestructuras ” Desarrollo, Innovación.
Español 8 lunes el 5 de diciembre Real Quiz: section 3.1 Define 3.2 vocabulario (pg. 111, 94-97) Tarea/HW: -Study vocab 3.2 sheet (learn 10 words per day!)
Clusters and Technopoles in Emerging Economies 2 cases in Chile By Cristobal Garcia.
/1 R1 / Rafael Rodriguez Sistemas de Comunicaciones Móviles FACULTAD DE INGENIERIA U.C.V. Escuela de Ingeniería Eléctrica Introduction to Wireless Communication.
Hispanic/Spanish Holiday Research Project Due: lunes, el primero de noviembre.
FACULTAD DE INGENIERÍA DEPARTAMENTO DE INDUSTRIA UNIVERSIDAD TECNOLÓGICA METROPOLITANA ESCUELA DE INDUSTRIA EVALUACIÓN TÉCNICA PARA LICITACIÓN EN SONDAJES.
Masculine Femenine Singularunmuchounamucha cuantopococuantapoca Pluralunosmuchosunasmuchas cuantospocoscuantaspocas Next.
Welcome to EFNEP and SNAP-Ed New Educator Training !
Telling time in Spanish ¿Qué hora es?. Talk about hours instead of o’clocks It is two o’clock It is 5 o’clock It is seven o’clock Son las dos horas Son.
IHR Risk Communication Capacity Building Workshop Bryna Brennan, Senior Advisor, Risk and Outbreak Communication PAHO/WHO Lima, Peru – March 2010.
Sewer System Rehabilitation Project of a Urban Basin using EPA SWMM 5.0 Remediation measures on sewerage system De Giorgis, Juan Alberto (1) Rezende, Osvaldo.
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
COMPANY PROFILE. Reservados todos los derechos por Vascat, S.A. THE COMPANY VASCAT S.A designs and develops HIGH DYNAMIC ELECTRICAL MACHINES We provide.
100 Book Challenge Desafío de leer 100 libros. Cada niño tendrán: Una bolsa de libros Una carpeta 2 libros para leer cada noche Un informe de lectura.
LAS PREGUNTAS (Question Formation). Asking “yes/no” questions To ask spoken questions that can be answered with a simple “yes” or “no,” simply raise the.
AQA Unit 2 Speaking Los medios La televisión La publicidad Las tecnologías de la comunicación La cultura de todos los días El cine La música La moda La.
Stamps to be traced. 2 and 3 ALC 21 Hoy es miércoles el 23 de octubre. match the columns writing out the words. 1.Fat 2.Handsome 3.Long 4.Old 5.Pretty.
DIFERENCE: Diesel Cycle vrs. Otto Cycle The diesel engines are often slow crankshaft speeds of 100 to 750 rpm, while gasoline engines work from 2,500 to.
English Presentation BY: ENRIQUE LÓPEZ ORTIZ. Centrifugal Compressors  Introduccion.  Compresor sistema.  References.
Aprendiz: Andrea Lorena Rodríguez. Convertible Notebook Features 11.6 "Celeron 2GB 32GB | TP200 Asus Vs Features Notebook 14 "4GB 1TB Ci7 | A455LF-WX145T.
Sources of Renewable Energy
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
Ir practice activities
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
Taller: Modelización de Energías Renovables Despacho Eléctrico
¡Me gustaría tener mucho dinero sin trabajar!
Lección 29 para el 6 y 7 de abril
First Grade Dual High Frequency Words
EN-EL SPS consolidation works in BA3, BB3 and BA7 during EYETS (do not include users cabling and optical fibers) N. Dos Santos on behalf of EN-EL.
¿Qué hora es?.
Youden Analysis. Introduction to W. J. Youden Components of the Youden Graph Calculations Getting the “Circle” What to do with the results.
ELECTROMAGNET Gregory Miguel Concuan Motta Ana Belén Guerra Marroquín Brayan Stid Ortiz Sosa.
P REFORM A DVANCED M OULDING PAM. SUMMARY 1.PAM PROCESS DESCRIPTION 1.PAM MACHINE DESCRIPTION 1.TECHNICAL FEATURES 1.TECHNOLOGY ADVANTAGES 1.FUTURE PERSPECTIVES.
By the end of the lesson you’ll be able to:  Identify key places in town  Give a description of the places  Provide an opinion on their town  Compare.
Quasimodo: Write your best interview question on a sticky note and put it on the poster board for your class at the front of the room. Traducir: We are.
Especificación de equipo contenerizado de generación eléctrica General Electric Jenbacher JGC420 a biogás POME Guatemala, marzo 2018 Agenda Especificaciones.
 We did this work with the objective of analyzing the state of water.
| CITSmart ITSM.
Introducción a las finanzas de los sistemas de agua potables
SMART MOBILITY Bernardo Baranda Sepulveda
FRACTIONAL REGULATION ENERGY SAVING DEVICE
Hace = For/Since.
Para Empezar P. 8 – el reloj p. 8.
Maria Carcamo 1 & 2 Febrero 2018
Unit 6 – A Talking about the future A class by Mr. Jean Paul Quiñonez Touchstone 3.
Formas y colores.
© ERICO ®, Inc NFPA 70 National Electric Code (NEC) Grounding & Bonding.
PRESENTATION: URANUS PLANET Student: Zambrano Garcia Carmen Araceli. Mrs. Flores Saldaña Ma. De Lourdes. Bachelor’s degree: LAET V-A Subject: Basic English.
Kindergarten Spanish High Frequency Words
Brochure y planímetro en ingles “variedad, exquisitez Con todo y para todos”
Career: Petroleum engineering TEAM: Guadalupe Christell Cerino Landero Carolina Pérez López Rosvit Yuliana de la Cruz García Alexis Emmanuel Jiménez Hernández.
Día número 26—español 1 ACT 2: Times after the 30 min mark
Inventory Fundamentals IITEM inventory management. Suppply and demand patterns Objetives of inventory management. Aggregate inventory management. Inventory.
JKSimMet Software (windows & buttons) Split Engineering Chile Ltda. General Salvo #331 oficina 201 Casilla Sucursal Panorámico Providencia – Santiago,
TRENCHING MACHINES Utility trenches for water, gas, and oil pipelines; shoulder drains on highways; drainage ditches and sewers. Relatively fast digging,
Indirect Questions First Day on the Job 11 Focus on Grammar 4 Part X, Unit 28 By Ruth Luman, Gabriele Steiner, and BJ Wells Copyright © Pearson Education,
Chapter 3 SCS Method. CONVERTING RAINFALL TO RUNOFF Runoff = Rainfall – Abstractions Q = P - I.
El agua.
Vámonos el 5 de diciembre SP 2: project draft SP 3: matching activity
Para el fin de esta leccíon, se puede:
Work safely for the most important people in you life, you family Work related injures cause not only time away form production activities at work but.
Welcome to PowerPoint gdskcgdskfcbskjc. Designer helps you get your point across PowerPoint Designer suggests professional designs for your presentation,
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Astronomy has really big numbers. Distance between Earth and Sun meters kilometers This is the closest star.
SCAL ANALYSIS OBJETIVES Special core analysis (SCAL) is one of the main sources of data available to guide the reservoir engineer in assessing the economic.
ACTA 96 GIGLIOTTI & GUALCHIERI MACHINE CHENILLe y retorcido VOLTAGE V ELECTRONIC BLOCK Equipped with an electronic programmer that grants a high.
CARACTERÍSTICAS TÉCNICAS TECHNICAL CHARACTERISTICS
a. Which job do you think pays more? I think an assistant chef earns more, as he spends all day working, while the dog walker earns according to the dogs.
Transcripción de la presentación:

SIMBA Automation and Remote Control Why automation? -Increase safety and efficiency -Reduce mining production costs Why remote control? -To take the most out of the advantages of automation

SIMBA Automation 1984SIMBA H222S - LKAB Prototype SIMBA with one hole automatic 1985SIMBA H259S - Austria First SIMBA with one hole automatic Rig still in operation! 1990SIMBA ECS Control System Automation available for all SIMBA rigs 1995SIMBA W469 - LKAB First W469 with full fan automatic

SIMBA Remote Control 1996SIMBA W469 - LKAB 2 rigs (W469) controlled by wire (Kiruna) 2 rigs (W469) controlled by wire (Malmb.) 1998COM LKAB 5 rigs (W469) controlled wireless (Kiruna) 4 rigs (W469) controlled by wire (Malmb.) 2001SIMBA RC - WMC 4 rigs (SH4356) controlled wireless (ODO)

SIMBA Remote Control SIMBA W469 - Project Targets - Improved precision drilling - Reduced capital and drill costs - Increased time of availability

SIMBA Remote Control SIMBA W469 - Rig - Precision drilling - Water pow. ITH - Remote supervised - Automated drilling - Holes 55m/115mm

SIMBA Remote Control SIMBA W469 - Project Results - Precision drilling<1,5% at 30m - Penetration rate0,6 - 0,8 m/min - Automaic92,5% holes in auto. - Time of availabilityMTTF > 100 hours - Down time< 7%

SIMBA Remote Control SIMBA W469 - Project Experience - Sturdy and reliable equipment - Close cooperation between customer/supplier - Preventive maintainance, service contract

SIMBA Remote Control COM Project Targets - Wireless communication - New control room for up to 11 rigs - Drill pattern handling and result analysis

SIMBA Remote Control COM Communication One control room Fiber optics Wireless up to 11 rigs Wireless

SIMBA Remote Control COM Control room - 2 work stations - Ctrl of up to 11 rigs - Con. with LKAB DB

SIMBA Remote Control COM Project Experience - A well defined modularity is nessesary - Prevent from fixed size limitations - Standardise communication - Operator workplace - Make it simple !!

SIMBA Remote Control SIMBA RC - Project Targets - Reduced capital and drill costs - Introduce remote control on Std SIMBAs with ECS control system

SIMBA Remote Control SIMBA RC - Layout Workstation Fiber optics Wireless up to NN Work stations up to NN rigs Wireless

SIMBA Remote Control SIMBA RC - Control room - NN work stations - Ctrl of NN rigs - Feed positioning - One hole auto. - Simpl. fault handling

SIMBA Remote Control SIMBA RC - Drill Rig - Rig positioning - Adv. fault handling

Automatic Production Drilling at LKAB Mines Nichlas Radegård Atlas Copco RDE Örebro

Robotised production drilling at LKAB History Hole deviation Robotised drilling with SIMBA W469

LKAB Kiruna

Sublevel caving

Sublevel caving- normal to super Blasts/day Production at Kiruna 60,000 ton/day

Simba W469

Targets: New generation longhole drill rig Simba W469 New generation longhole drill rig Simba W m 30.0 m - Improved precision drilling - Reduced capital and drill costs - Increased time of availibility

Cooperative developement agreement, october -93 LKAB - Atlas Copco Delivery of up to rigs before 1999 Drill rig 1 - delivered 1995 Drill rig 2 - delivered 1996 Drill rig 3, 4, 5 and 6 delivered during 1997 Drill rig 7-9 delivered 1998 and 1999 Drill rig no 10 to be ordered 2000 New generation longhole drill rig Simba W469 New generation longhole drill rig Simba W469

Length 12.9 m - Width 3.0 m - Height 3.0 m Weight 37 ton - Power 170 kW Simba W469 Hole depth 55 m - Hole dia. 115 mm Parallell holes 4.4 m

Precision drilling Target: hole deviation < 1,5% at 30 m hole depth Total length rock drill + guide tube= 2,3m Drill tubes dia. 102 mm, length 2,3m

Simba W469 control room at Kiruna Controlroom at 740 m mainlevel

Simba W469 - ”Robot Simba” DemandResult Precision:Deviation. < 1.5% at 30mConfirmed Collaring:Max. fault < 0.5 o Confirmed Automatic:Min. 6 holeAverage of one fan from hole

Simba W469 - ”Robot Simba” DemandResult Available time:MTTF > 100 hours103.9 hours Not available time:< 12 hours of hours Penetration rate:> 0.60 m/min m/min (300 m/day, best > 630 m)

Simba W469 - ”Robot Simba” Automatic facilities - precision positioning of the feed - accuracy and smooth collaring - drilling and tube handling to preprogrammed hole depths - uncoupling, positioning of drill tubes to tube magazine - repositioning of feed to next collaring point

Experience of successful automatics sturdy and reliable equipment close cooperation between customer/supplier predictive maintenance, service contract Simba W469 - ”Robot Simba”

Close Cooperation between customer/supplier Simba W469 - ”Robot Simba” define customer needs -application -drill capacity need -softvare parameters -logging functions -drill pattern transmittion operators - service technicians

The concept for remote control

Power media: Compressed air, 7.0 bar Compressed air, 18.5 bar Long Hole Production Drilling 1000 m 3 /man, shift Handheld rock drill flexible drill steel Heavy rock drill column mount Rail rig carrier hydraulic positioning Light mobile rig with air traction Twin drill rig unit remote control Crawler carrier ITH-hammer, large holes Crawler ITH, high pressure large holes 500 Pneumatic drilling

Power media: Hydraulics, bar Water hydraulics, bar Long Hole Production Drilling m 3 /man, shift Hydraulic rock drill light mobile rig, air traction Diesel traction, operator’s cabin remote control, rod handling Diesel traction, cabin, high- power drill automatic controls, tube drill string Robot drilling, two units, precision drill string water powered ITH hammer Hydraulic drilling