1. Kongwa - Saneamiento 2. Same – Medio Ambiente 3. Muheza – Cambio Climático 4. Kilombero - Energía
Suministro de energía eléctrica asequible y producción de carbón verde a partir de la gasificación de la cascarilla de arroz para áreas no conectadas a la red general de suministro
Escalera de acceso a la energía
Antecedentes
A Project Key Data Brief Project DescriptionThe Project envisages the provision of electricity from Rice Husk Gasification (32 kW) for the community of Mbingu, Kilombero District (Tanzania) Type of projectDemonstration Project Expected starting date of project1 st January 2015 Expected project completion date31 st August 2016 Project duration [months]20 months Project implementation address (if different from the lead applicant address below) Mbingu village, Kilombero District, Morogoro Region, Tanzania Total project cost [Euro] ,00 Eur Amount of funds requested from EEP Eur Amount of co- financing secured Eur Number of households with increased access to sustainable energy 150 Households, 2 institutions and 15 SMEs directly connected.
Socios
Modelo de negocio The energy utility will be established and owned by a company limited by guarantee (non-profit) formed by ONGAWA (30% of the property), TaTEDO (30%) and HPS (30%). The partnership will be open to other partners (10%), such as social investors, local entrepreneurs or local authorities. The benefits of the company will be reinvested in expanding capacity and network coverage. The company will have a shareholders' meeting (board of trustees) once a year to monitor the operation, approve budgets, determine the allocation of benefits and to confirm the director and employees. For everyday operation, the company will have a manager, who will be ultimately responsible for the operation and administration of the plant, and 2 resident staff in two shifts that will be recruited to run and manage the plant in the village. One of them will be in charge of the plant operation and the other will be in charge of the micro-grid and the revenue collection from pre-paid vouchers.
Datos técnicos Gasifier Gasifier TypeDown Draft Rated Capacity40kVA Fuel typeRice Husk Gas Volume150 cu.ft. Avg. gas calorific value 1050 Kcal/ NM3 Char removalDry Char Discharge Permissible moisture content20% maximum Start up and operationThrough electrical blower Blower TypeCentrifugal Gasifier
Briquetting plant CharacteristicPiston pressScrew extruder Optimum moisture content of raw material 10-15%8-9% Wear of contact parts Low in case of ram and die High in case of screw Output from the machineIn strokesContinuous Power consumption50 kWh/ton60 kWh/ton Density of briquette1-1.2 gm/cm³1-1.4 gm/cm³ MaintenanceHighLow Combustion performance of briquettes Not so goodVery good Carbonisation to charcoalNot possible Makes good charcoal Suitability in gasifiersNot suitableSuitable Homogeneity of briquettesNon-homogeneousHomogeneous
Plan de Negocio
Resumen Cronograma 1.Constitución del equipo y de la compañía 2.Planificación participativa 3.Dimensionamiento y diseño 4.Declaración de impacto ambiental 5.Adquisición de los equipos 6.Formación en O&M 7.Construcción de la planta 8.Cableado 9.Formación en desarrollo de negocio 10.Monitoreo y evaluación TaTEDO (30%) HPS (30%). (10%) abierto a emprendedores e instituciones locales Los beneficios de la compañía se invertirán en aumentar la capacidad de la planta y la cobertura del sistema
Cronograma
Planificación apoyo grupo Energía de Ongawa TareaAmbitoPlazosProducto Revisión diseño técnicoTécnicoQ1 2015Docs referencia y guía Apoyo búsqueda normativa técnica (red de distribución)LegislaciónQ1 2015Docs referencia y guía Revisión requisitos para financiación mediante performance grantsTécnicoQ3 2015Docs referencia y resumen Análisis del modelo de negocio (PPP) Modelo de intervenció nQ Docs referencia y recomendaciones modelo Seguimiento de la intervenciónTécnico Q1-Q Varios Gestión conocimiento (preguntas)TécnicoQ Documento preguntas (objetivos conocimiento)