MAXIMIZER TRAINING
Old Time Distributors
Early Rosco Distributors
Distributor Uses Spraying Tack or Prime Handspraying
Maximizer II Gold Distributor
Clean, Simple Spraybar Fewer hoses to spraybar Internal spray valves Easy solenoid replacement Maximizer II
Clean, Simple Spraybar Fewer hoses to spraybar Internal spray valves Easy solenoid replacement Maximizer II
Spraybar 1-Foot Extensions Maximizer II
Maximizer 3 Maximizer 3 Distributors
Spraybar Maximizer 3
Variable Width on the Move Maximizer 3
Tank Construction Complete 2” rockwool insulation Insulation pinned in place Maximizer II
Tank Construction Tank meets all Federal DOT Regulations 100% welded inside & outside 8 inch flue pipe throughout tank Staggered surge openings Maximizer II
Maximizer 3 Front Live Power
Front Live Power Manual Override
Radar Horn – Hydraulic Tank Measures speed – distance traveled
Viking Asphalt Pump
Viking Pump Relief Valve
Maximizer II Manifold Box
Pump Coupling
Tank Valve
Two-Way Valve
Three-Way Valve
Max II Rear Center Control Box
MAX 3 REAR CONTROL BOX
Propane Burners
Diesel Burners
Rear Burner Controls
Flue Liner
Maximizer 2 Controller
Maximizer 3 Controller
Max II EZ-2S Cab Control Box
Max J-Plugs
Max II J-Plugs
Max 3 J-Plug
D C 2 Micro-Processor D C 2 is located on Controller tower in cab on most units. Units manufactured thru 2001 have “blue” boxes. Units manufactured 2002 to present have “black” boxes.
3 way/2way Valves
Load Mode
Tank Circulate
Spraybar Circulate
Spray Mode
Reverse Suction
Cleanout Mode
Spray Nozzle Guide
Speed Calibration
Flow Calibration
Troubleshooting
Electrical Troubleshooting
Testing Beckett Burner
Electrode Adjustment
Max II Spray Valve
Max 3 Spray Valve
OUT WITH THE OLD MAX 3
IN WITH THE NEW MAX 3 B
OUT WITH THE OLD
IN WITH THE NEW company confidential Solvent Circulate Valve Enviro-flush Solvent Valve Diesel Solvent Valve 91
OUT WITH THE OLD
IN WITH THE NEW