Especificación de equipo contenerizado de generación eléctrica General Electric Jenbacher JGC420 a biogás POME Guatemala, marzo 2018 Agenda Especificaciones.

Slides:



Advertisements
Presentaciones similares
Telling Time Grammar Essential #8.
Advertisements

Las Tiendas Grocery Shopping in the Spanish-speaking world.
*** 3 MINUTES *** Objective: I can write and talk about my and others family members Vocab/Ideas: Family members (review) Possessive adjectives (review)
el plato-plate el tenedor-fork la cuchara-spoon el cuchillo-knife el vaso-cup la servilleta-napkin la cuenta-bill.
OPT: En las noticias. Las presentaciones empiezan miércoles, el 9 de abril (el cumpleaños del Sr. Romero )  Van a hacer una presentación de Las Noticias.
Preguntas Esenciales 1.What are essential questions? What are their purpose in learning? 2.Look over the essential questions and think about how they might.
Back to School Night Salón de clase A ¡Bienvenidos a la clase de español con la Señora Sanders! Español MYP 3 Hora 6 Español MYP 2 Hora 1.
Hacer Ahora (Escribe la fecha)
¿Qué hora es? Son las diez.
Tu Día Escolar Español 2 Tema 1 Página 40.
Parent Meeting Junta de Padres Raising A Reader Creando un Lector.
TIENEN 5 MINUTOS Hoy es el _____ de _____ del __________ Objective : I can identify and say prepositions Vocab/Ideas : Sobre Detrás de Debajo de Entre.
Why do you need to learn English?  Schedule: Saturday: 8 a.m – 2:00 p.m – P609  Course book:  New Framework 2 pre-intermediate (units 1-6) - Richmond.
Unit 2A: Lesson 2 How to Talk About Your Schedule Gramática- Present tense of –ar verbs.
BILINGUAL TRAVEL AGENCY VOCATIONAL TRAINING COURSE: 1st year. BILINGUAL PROFESSIONAL SUBJECT: ORGANIZACIÓN Y CONTROL EN AGENCIAS DE VIAJES (O.C.A.) Organization.
La Hora ( Telling Time). Here’s how it works! What time is it? What time is it? It’s ______ o’clock. It’s ______ o’clock. It’s 2 o’clock. It’s 2 o’clock.
ALC 63: Traducir Hoy es miércoles el 25 de marzo, 2015 I text on the phone every day. What do you do everyday? I play video games in my living room. Where.
¡Buenos días! Trabajo del timbre: 1. Pongan la tarea en tu pupitre. Put your out on your desk to be checked (or Missing Work Log). 2. Repasan los miembros.
Telling Time Notes Escribe Las notas!. Agenda Students you are required to fill in the blanks as your notes! Save ppt in my documents Save ppt.
Welcome to SAT Parent Night. What is the SAT? The SAT-10 is a district mandated assessment carried out to obtain District-wide data about student performance.
Para hacer ahora 1) ¿Cuál es la fecha de hoy? 2) ¿Cuál es la fecha de mañana? 3) ¿Cuáles son las estaciones del año?
Día mundial del agua El día es el 22 de marzo Llama la atención sobre lo importante que es el agua para todos Hay siempre publicidad para presentar los.
Foreign Language Teaching Tips Rich Bradshaw. ¡Classroom Vocabulary Scavenger Hunt! Purpose Introduce new vocabulary words in TL Identify items using.
Despacho de aeronaves – uso de la MEL Normativa aplicable y aspectos prácticos.
¿Qué ropa compraste? Español 2 Tema 2B. Cápitulo 2B Vocabulario.
Welcome! Conversation Classes. Remembering Names Everyone Stand! Introduce yourself to class and give your name an action! Go around the class and try.
Fiesta en Familia Español 1 Tema 5 Página 244.
Hoy es miércoles el dieciocho de marzo.
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
Vámonos Take out a sheet of paper for your Review activities today. Put your name on that sheet of paper and on the scrap paper in front of you.
Hoy es el _1 / 4____ de _marzo____ del __2013________
To be, or not to be? Let’s start out with one of the most important verbs in Spanish: ser, which means “to be.”
Taller: Modelización de Energías Renovables Despacho Eléctrico
Capítulo 3: ¿Qué clases vas a tomar?
Español 1 11 de mayo de 2017 Good morning, thank you for taking my classes today. For the most part the kids are really great. Here is my schedule for.
DAR and DECIR to give and to say/tell.
El 28 de Agosto Objetivos:
First Grade Dual High Frequency Words
¿Qué hora es?.
Hoy es miercoles, el diez de agosto
Articulando políticas y Reforzando capacidades creativas
PowerPoint Templates provided by PresentationPoint.com Software solutions for digital signage and data driven presentations.
Classroom Phrases.
Para hacer ahora Identifiquen los números
Put away everything and have a pencil and an eraser.
Terms related to human resources 1.Training 2.Staff selection 3.Induction 4.Vacant 5.Employment contract 6.Occupational health 7.Labor welfare 8.Payroll.
Términos 1.Capacitación 2.Selección 3.Inducción 4.Vacante 5.Contrato Laboral 6.Salud Ocupacional 7.Bienestar laboral 8.Nomina 9.Servicio al cliente 10.Reclutamiento.
WELCOME BIENVENIDO Ms. Colet’s Achieve Class Presentation.
Inventory Fundamentals IITEM inventory management. Suppply and demand patterns Objetives of inventory management. Aggregate inventory management. Inventory.
WELCOME BIENVENIDO Ms. Colet’s Achieve Class Presentation.
JKSimMet Software (windows & buttons) Split Engineering Chile Ltda. General Salvo #331 oficina 201 Casilla Sucursal Panorámico Providencia – Santiago,
Miranda Rights El Aviso Miranda
el 26 de agosto MATERIALS: Class set worksheet
19 de agosto de 2013 Pregunta Esencial: Who are you? Who am I?
Ultrasound. Invented by: The ultrasound was invented by Dr. Ian Donald in 1958, Donald was born in Scotland in 1910, was the pioneer in the use of diagnostic.
The verb ESTAR and Emotions and Reviewing adjective noun agreements
Organización Mundial de la Salud
Día mundial del agua El día es el 22 de marzo
el 26 de agosto MATERIALS: Class set worksheet
Below are the 3 sentences you have been learning in class today.
Tell what each person is going to do, based on the picture.
HAGAN AHORA HOJA DE TRABAJO 2B - 1
Vámonos: TIENEN 5 MINUTOS Unit 2: El alfabeto y la pronunciación
Hoy es________, el _______ de _____ de ______________.
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Miss Gabriela García and miss carolina ortiz
Que hora es? What time is it?.
Basic 3 Course Orientation / Induction Week 1. AGENDA Course Information Aim of the Sessions Using zoom Assessment.
a. Which job do you think pays more? I think an assistant chef earns more, as he spends all day working, while the dog walker earns according to the dogs.
Transcripción de la presentación:

Especificación de equipo contenerizado de generación eléctrica General Electric Jenbacher JGC420 a biogás POME Guatemala, marzo 2018 Agenda Especificaciones técnicas JGC420 de 1426 kW e Dimensiones e isométrico Beneficios MSA – material streeming agreement OPT - operator training myPlant – Asset Performance Management solution, monitoreo remoto Long block – mayor overhaul Imágenes del equipo durante la descarga en Bogotá 1

Especificaciones técnicas JGC420 2

Installation plan JGC420 3

4

Acuerdo de suministro de partes MSA (Material Streaming Agreement) y acuerdo de servicios Descuentos importantes para partes de mantenimientos programados El acuerdo de MSA tiene 10 % de descuento sobre el precio de lista en partes y 5 % en el long block a las 60,000 horas. Entrega de partes según horómetro Las partes se pagan en el momento de estar disponibles en fábrica Son fabricadas con tiempo prudencial antes de llegar al horómetro y para tenerlas a tiempo en planta Incrementos anuales menores Los incrementos anuales normales son del 3 al 5 % fuera de MSA En acuerdo MSA los incrementos anuales se indexan a tabla de Ministerio Economía de Austria ya que los equipos son fabricados en Jenbach, Austria En los últimos ocho años el incremento anual ha variado de 0.8 a 1.5 % únicamente. Acuerdos prestación de servicios Prestación de servicios con técnicos en la región Técnicos con amplia experiencia en equipos GE Jenbacher y certificados por GE 5

OPT - Operator Training Target group Customers and operating staff of Jenbacher gas engines who have to be familiar with day-to-day equipment operation and maintenance tasks in accordance with the 1,000 / 2,000 operating hours maintenance intervals. This training is a prerequisite for the course modules ´TJM - Training on the Job - Maintenance´ and ´TJE - Training on the Job - Extended Access to DIA.NE XT´. Theoretical and practical contents - Engine general - Engine components - Operation modes - Technical documentation - Operation materials - Engine management system (e.g. manual and automatic engine operation, operation of DIA.NE XT und DIA.NE WIN at operator level, Adjustment and optimisation of DIA.NE XT parameters for starting and idle operation) - Inspection and maintenance works according to our maintenance schedules (e.g. measurements at the ignition system and adjustment of spark plugs, data collection for the daily log book, valve clearance adjustment) Participation in this training course will give you - a good overview of the Jenbacher gas engine technology - the ability to understand operating documents and their structure - an insight into the structure of a Jenbacher gas engine module and terminology for the individual components - the necessary knowledge to successfully operate Jenbacher gas engine equipment in manual and automatic modes - the ability to identify and remedy the most common malfunctions and errors - the necessary knowledge to carry out 1,000 and 2,000 operating hours maintenance tasks Duration 3 days - 19,5 training units of 60 minutes each, 4 days - 26 training units of 60 minutes each with interpreter Number of students Minimum 5, up to 8 students Languages German, English Further languages on request / with translator Prerequisites - Knowledge of electrical or mechanical engineering - Participants must bring their own safety boots 6

7

8

Longblock scope of supply 9