4 Mayo, 2006 CETA Miguel Cárdenas Montes CETA-CIEMAT Centro Extremeño de Tecnología Avanzada CETA
Summary Objectives Capacities Chronogram ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 2
Objectives CETA-CIEMAT aims to: To create a center of excelence at Extremadura in the areas of Grid Technologies and e-Science. The center is located at Trujillo (Extremadura). ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 3
Capacities, CPU At the end 2005 CIEMAT purchased for the CETA the following computing resources: 97 Blades: Dell PowerEdge 1855 Dual Xeon 3.2GHz, 4 Gb RAM. 56 HP Proliant BL25p, dual Opteron (2.0 GHz) dual core, 4 Gb RAM. ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 4
Capacities, SPECs Following the SpecInt2K showed at spec.org for these computers: DELL 1555*2*97 = 301,670 SpecInt2K HP 1508*4*56 = 337,792 SpecInt2K Total = 639,462 SpecInt2K ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 5
Capacities, Storage I Storage over hard disk: 22 dual Xeon with 2 HBA, 11 blades Raid DS4100, with 154 hard disks of 400 GB each of one, 11 blades EXP100, with 154 hard disks of 400 GB each of one. The configuration is 11 logical bricks with 2 servers plus 1 DS4100 plus 1 EXP100. Total 120 Tb. ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 6
Capacities, Storage II Storage over tape: IBM LTO tape library 3584, with 4 drivers, and 400 tapes units of 400 GB. Total 160 TB. ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 7
Present Status At this moment the hardware is out the boxes, switch off in the CPD of Madrid, waiting for the new fan system (after the new space gained). When the fan system be ready the computers will be switch on. In parallel, at Trujillo we are creating a provisional (and little) CPD, where some computer (not a lot of) will be moved. ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 8
and the future We foresee the following chronogram This summer the infrastructure de EELA will be ready at Madrid. In the fall, a new cluster of EELA will be ready at Trujillo. The new center at Trujillo will be completely ready in 18 months. ALICE + CIEMAT + CETA + EELA Centro Extremeño de Tecnologías Avanzadoas Madrid, 4 de Mayo p 9