“ DESIGN OF A MASTER MAINTENANCE PLAN FOR 6 EQUIPMENT AT KIMBALL ELECTRONICS MEXICO S.A DE C.V” August 2018 Reynosa, Tamaulipas Alfredo Alejandro Chávez.

Slides:



Advertisements
Presentaciones similares
Game Cluedo: How to Play 1.Your group should have the 21 cards containing 6 cards of suspects, 9 rooms and 6 weapons, a tally card for each member and.
Advertisements

Telling Time Unidad 2 Etapa 2. Telling time in Spanish : Its 2:00.--Son las dos. Its 3:00.--Son las tres. Its 4:00.--Son las cuatro. Its 5:00--Son las.
Los verbos estar y ser “to be”
Los Verbos Capítulo 1 Parte 2.
Spanish –er and –ir verbs. Verbs in General English and Spanish both conjugate verbs. They can be organized as 1rst, 2 nd, and 3 rd person. If you need.
What time is it? DLT: I can tell time in Spanish..
1 – 999,999,999.
Los verbos reflexivos Objective: To be able to talk about your daily routine. Getting ready for a special event.
First Grade – High Frequency Word Reading Competition Classroom Competition Created by: Malene Golding School Improvement Officer: Kimberly Fonteno.
Science Career Research Project By Jose pineda. Name of Job: Electrical Engineering I like that I would like to invent new electric and new social networks.
Hoy es viernes, el 26 de septiembre
Digital Photography: Selfie Slides
Digital Photography: Selfie Slides Liliana Martinez 10/27/14 4b.
Digital Photography: Selfie Slides Your Name Date Class Period.
Digital Photography: Selfie Slides By: Essence L. Thomas.
Digital Photography: Selfie Slides Your Name Date Class Period.
Water Conservation: water conservation is very important to the world, not only because we waste it when we don’t need it, but because were wasting water.
Digital Photography: Selfie Slides Your Name Date Class Period.
Digital Photography: Selfie Slides Your Name Date Class Period.
Digital Photography: Selfie Slides Makayla Hughes 10/29/ rd period.
Time Telling time is rather easy. You only need to know the numbers up to 59 to be able to tell the time.
Digital Photography: Selfie Slides
Digital Photography: Selfie Slides Caidyn Tanton 10/23/14 Period: 1.
The Future Tense -original PowerPoint created by Mrs. Shirley of North Intermediate High School in Broken Arrow, OK.
Digital Photography: Selfie Slides Reid Steele 10/24/14 1st.
Digital Photography: Selfie Slides Jaime lozano 28 oct 1.
What time is it? DLT: I can tell time in Spanish..
Los verbos reflexivos Objective: To be able to talk about your daily routine. Getting ready for a special event.
Horario 19 viernes el 14 de octubre Bienvenida-ALC-objetivo Speed date Flash cards of stem changers – word search. Dr. Frankenpiedra Stem changer – irregular.
Input Devices. An input device is a piece of equipment used for entering data or controlling a computer, for example, a mouse, a keyboard, a scanner,
Haz ahora el 27 de octubre de 2015 Complete each sentence with the correct form of ser and estar: 1.Mi cuarto ________ al lado de la sala. 2.Manuel y Fernando.
 In another countries show us that the Sci-Fi is too close to the reality, they make very impressive robots like animals and persons.  Then, if.
Tienes un nuevo mensaje…. Ella era una chica timida, llamada Lina, no tenia amigosy solo convivia con su familia especialmente con su madre y su padre…
Sources of Renewable Energy
The Preterite Tense Spanish 1 – 6.2.
Gustar V. Encantar.
Calentamiento Hoy es lunes, el 9 de enero
¿Qué hora es?.
EspaÑol 1 Lesson 3 30 de Agosto de 2016
Español 1 9 de diciembre de 2016.
SER and SUBJECT PRONOUNS
Interactive Math Notebooks
First Grade Dual High Frequency Words
11/23/2017 Safely Climbing Up & Down on Machinery.
SAG – Soluciones Avanzadas en Gas SAG vision and mission – Peruvian market We facilitate the encounter between the market and the best technologies.
ELECTROMAGNET Gregory Miguel Concuan Motta Ana Belén Guerra Marroquín Brayan Stid Ortiz Sosa.
P HASE DIAGRAMS OF PURE SUBSTANCE Roberto Carlos García Zúñiga.
FRACTIONAL REGULATION ENERGY SAVING DEVICE
Los números.
The present tense of ir and jugar
Quasimodo: Tienes que hacer parte D de la tarea..
ROCANROL VOCABULARIO ANTES DE JUGAR (before playing)
How to Conjugate… SPANISH VERBS.
Kindergarten Spanish High Frequency Words
Capítulo 1 Lección B Vocabulario II
An Animated PowerPoint Template. This 2007 PowerPoint contains video animation, but does not support text over video. The PowerPoint 2010 version includes.
Title area max over 2 lines Insert Topic Icons Click on the picture icon and browse to the location of the Topic Icons AkzoNobel Bullets Only use the List.
A PowerPoint Template Your Presentation Name. This text is a placeholder Main Content Page Layout 2 Copyright 2009.
Ultrasound. Invented by: The ultrasound was invented by Dr. Ian Donald in 1958, Donald was born in Scotland in 1910, was the pioneer in the use of diagnostic.
Organización Mundial de la Salud
Gustar, Interesar, Aburrir
Development of the concert programme
Welcome to PowerPoint gdskcgdskfcbskjc. Designer helps you get your point across PowerPoint Designer suggests professional designs for your presentation,
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Astronomy has really big numbers. Distance between Earth and Sun meters kilometers This is the closest star.
How much? - How many? English Grammar. When we want to know the quantity or amount of something, we ask questions starting with How much and How many.
ACTA 96 GIGLIOTTI & GUALCHIERI MACHINE CHENILLe y retorcido VOLTAGE V ELECTRONIC BLOCK Equipped with an electronic programmer that grants a high.
Quasimodo: “Por lo demás, hermanos, todo lo que es verdadero, todo lo honesto, todo lo justo, todo lo puro, todo lo amable, todo lo que es de buen nombre;
TexPoint fonts used in EMF.
Transcripción de la presentación:

“ DESIGN OF A MASTER MAINTENANCE PLAN FOR 6 EQUIPMENT AT KIMBALL ELECTRONICS MEXICO S.A DE C.V” August 2018 Reynosa, Tamaulipas Alfredo Alejandro Chávez Vázquez

The Project is designed at Kimball Electronics S.A de C.V Address: Av Mike Allen Av. 1145, Industrial Reynosa, Reynosa, Tamps. Tel: COMPANY This company designs and manufactures printed circuit boards for different industries: Automotive, medical, industrial and public safety.

EQUIPMENT ERSA VERSAFLOW 3/45 Criticality Level: High Risk This equipment welds pins of the electronic boards (PCB) APOLLO SEIKO Criticality Level: Medium Risk This equipment welds pins of the electronic boards (But this machine produces less product)

EQUIPMENT ROUTER CENCORP Criticality Level: Medium Risk This equipment cut electronic boards according to the model to prepare them for the next process. PVA Criticality Level: High Risk This equipment puts a conformal coating on the PCB

EQUIPMENT AOI Criticality Level: Medium Risk This equipment inspects the material after welding process to verify and ensure the good quality in the welding. JADE Criticality Level: Medium Risk This equipment welds pins of the PCB (But in more time)

LAY-OUT 1.- Selective Machine ERSA 3/45 Halla Mando’s Line 2.-Selective Machine Apollo Respironics Line 3.-Conformal Coating Machine PVA 4.-Router Machine 5.-Selective machine JADE 6.AOI Pemtron

IMPACT RISKWEIGHT HIGH RISK24-17 MEDIUM RISK16-9 LOW RISK8-0 CRITICALITY MATRIX

Equipmen t name Criterion Number of failures weight 4 max. Criterion Operationa l Impact weight 4 max. Criterion Operationa l flexibility weight 4 max. Criterion Safety and envionmen tal impact weight 4 max. Criterion Equipmen t cost weight 4 max. Criterio n Mainten ance cost weight 4 max. Total score 24 MAXIMU M Criticality level ERSA VERSAFLOW 3/ High Risk PVA High Risk ROUTER Medium AOI Medium JADE Medium APOLLO SEIKO Medium

MISSION AND VISION OF THE MAINTENANCE DEPARTMENT MISSION To eliminate the unnecessary costs generated by inappropriate maintenances, decrease the number of fails, increase the availability of the equipment and to improve the stability of the productive process. VISION. To be the best department in the company providing high quality maintenances according to the standards that we have.

STRATEGY PLAN MAINTENANCE

MAINTENANCE INDICATORS The Maintenance indicators that are used in the company are mainly two the OEE and the Yield both are used to establish the number and level of fails also the production in all the equipment with different graphics.

MAINTENANCE INDICATORS OEE Availability = Run Time / Planned Production Time Performance = (Ideal Cycle Time × Total Count) / Run Time Quality = Total Count – Defects/Total Count OEE = Availability × Performance × Quality

STRATEGY TO INCREASE THE OVERALL EQUIPMENT EFFICIENCY (AVAILABILITY)

1Photo 2 ERSA VERSAFLOW 3/45 3 Serial number: SO-11B-17D Brand: ERSA 5Model: VERSAFLOW 3/45 6Company´s identification number(UMH-PRO-01): Voltage: v 8Amperage: 102 A 9Fases: 3 10Potency: 68 kW 11 Purchase date: May Waranty (expiration date): 18 August Manufacturing date: April Width: 1.7 meters 15Length: 5 meters 16 Height:2.25 meters 17Technical specifications:It Works with coordenates that need to be exact.

18 Technical specifications 2: It Works with 0.7 of nitrogen pressure 19 Technical specifications 3: It Works with two preheaters with a temperature of 240 C 20 Technical specifications 4: It Welds with SAC 305 soldadure 21 Technical specifications 5: It Works with two types of flux 265 and R800 22Equipment Function. It is used on the welding process to Weld the pins of the electronic boards 23Systems: por ejemplo: It has pneumatic, electrical and mechanic system 24Department/área/ Productin Line: It is used on the welding engineering process 25Transportation Requeriments: Is necessary a lift truck for the correct transportation 26Installation Requerimients: Needs electrical, air and nitrogen sources 27Special Requerimients:The conveyor needs to be exactly adjusted for the pallets 28Recommendations: Don,t turn of the machine with the button only use the stand by 29 Hazardous wastes: The dross from the pot is treated according to the hazardous paper on the machine, is necessary to put the dross on the recuperation área. Supplier name: Mashine gegeben (German supplier) 30 Supplier data: NA 31 Address: Wertheim, Germany 32Telephone:NA 33 NA 34Contact: NA

THE MOST CRITICAL EQUIPMENT This equipment is considered as critical because if this equipment fails the line stops and at the same time the production stops. It affects all the processes that continues after the selective machine. Machine/EquipmentCode Selective Machine ERSA Versaflow 3/ TaskFrecuency Change the type of flux. First we need to close all the valves and after that we need to despise, finally we need to purge all the old flux later we need to clean it with alcohol and finally to fill the tank with the new flux. NA Tools/Materials Gloves, glasses, alcohol,cloth. In case of a power blackout we need to tun off the machine with the contact breaker and when the energy backs we need to verify that the machine Works correctly. NA Tools/Materials Gloves, security glasses. In case of a preheater’s resistance fails we need to change it for a new one, but first of all we need to wait until the temperature decreases, and when is cold we can change it. NA Tools/Materials High temperatura gloves, glasses, cloth.

Thank you for your attention