EN-EL SPS consolidation works in BA3, BB3 and BA7 during EYETS 16-17 (do not include users cabling and optical fibers) N. Dos Santos on behalf of EN-EL.

Slides:



Advertisements
Presentaciones similares
-go Verbs There is a small but very important group of verbs that we call the -go verbs. These verbs are: Hacer: to make/do Poner: to put Decir: to say.
Advertisements

Rare Pride Latin America Program Second University Phase, Guadalajara Week 1, 11 th – 15 th October, 2010.
Propuesta para la conservación de los atunes aleta amarilla y patudo en el Océano Pacífico oriental Proposal for conservation of yellowfin and bigeye tuna.
Hispanic/Spanish Holiday Research Project Due: lunes, el primero de noviembre.
RED SISMOLÓGICA NACIONAL
5 th Grade 2 nd Six Weeks Science Unit 2, Lesson 1 CScope Vocabulary Words
Irregular Preterite Endings Unit 1 Escrito por ________.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 621 Brief Description: Breve Descripción del Proyecto: Project Name and Location: Solid Waste.
Hazlo Ahora Looking at your tracker from last week, how many days out of the four were you above the class average? How many below? What would you like.
Some “boolean” concepts The following series of slides is not supposed to give you answers, but to provide substance for thought and ponder. The placenta.
Please sit in your assigned seat. Silently complete the “warm up” section of your paper.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) 541 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Replacement.
Week 4 Spanish I Grade Week 4Do Now 1 Monday, September 28th, 2014  Define the following numbers in Spanish.  16  14  11  15  20.
Science Career Research Project By Jose pineda. Name of Job: Electrical Engineering I like that I would like to invent new electric and new social networks.
Hoy es viernes, el 26 de septiembre
El tiempo Follow the directions in the “notes” section on each slide of this PowerPoint. Save the file with your name and to
LOS QUEHACERES DE JORGE
El 18 de febrero, 2015 ¿Hay una iglesia, mezquita, or sinagoga en tu barrio?
Monday & Tuesday 26/8/13 & 27/8/13 Please remember to get your folder! You will need a textbook today, so please get one. First Five Get ready to go over.
Bienvenida ALC 135 Miércoles el 13 de abril. objetivo Yo puedo presentar el ppt de la Semana Santa.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 580 Brief Description:Breve Descripción del Proyecto: Project Name and Location: Expansion.
Julie Pettigrew Future career and personality traits Rushcliffe School.
11 de diciembre. Para Empezar ¿Qué cosas tienes en tu dormitorio?
SPANISH 2 HONORES NOTEBOOK ( ). FECHA:  HOY ES MIÉRCOLES EL 27 DE AGOSTO DE  AYER FUE ________________EL _____ DE _______________DE 2015.
MDD DIVISION DIRECT DRIVE MOTORS. Reservados todos los derechos por Vascat, S.A. ¿WHAT IS A DIRECT DRIVE TORQUE MOTOR?  Synchronous permanent magnet.
ALC 59 match Hoy es miércoles el 29 de febrero Liquidación Ganga Regatear Precio Color Bargain/deal/sale Price Clearance Color To bargain.
By Jimmy Wendt, Mike Kalis, and Craig Wocl.  In 2005, Carlos Beltran signed a 7 year, $119 million contract to play with the New York Mets  At the time,
3 rd Grade 2 nd Six Weeks Science Unit 2, Lesson 5 CScope Vocabulary Words
ESPAÑOL 1 8 de febrero de LA CAMPANA  ¿Cómo es tu mejor amigo?  Escribe 5-7 frases completas de tu amigo. La participación #1.
ESPAÑOL 1 Lesson 50 5 y 8 de febrero de LA CAMPANA  ¿Cómo es tu mejor amigo?  Escribe 5-7 frases completas de tu amigo. La participación #1.
ALC 62 Jueves el 2 de diciembre All slides are on timer Bring coloring items mañana.
¿Dónde está el almacén La Galería? Español 8 – Capítulo 7B – – Sr. Reilly.
Stage 1: “My visit to the fair” / Etapa 1: “Mi visita a la feria”
AQA Unit 2 Speaking Los medios La televisión La publicidad Las tecnologías de la comunicación La cultura de todos los días El cine La música La moda La.
F-25 CHECK LIST DE DOCUMENTOS PARA CONSULTA (BIBLIOTECA) PROYECTO 503 Brief Description:Breve Descripción del Proyecto: Project Name and Location : Improvements.
Learning activity 4 / Actividad de aprendizaje 4 Evidence: Consolidation activity / Evidencia: Actividad de consolidación Stage 1: “My visit to the fair”
Learning activity 4 / Actividad de aprendizaje 4 Evidence: Consolidation activity / Evidencia: Actividad de consolidación Stage 1: “My visit to the fair”
Matrimonio como Sacramento
VOCABULARIO: Capítulo 1A.
Alter-Ego Project Exercise 1
Las preposiciones Prepositions of place.
Notas sobre trampa Ingreso medio
Short Shipments/Pre-Delivery Defects Electric Rope Shovels and Drills February 2013.
MY LIFE IN A DREAM. TABLE OF CONTENTS ACKNOWLEDGEMENTS I DEDICATION
Write the following in Spanish.
SAG – Soluciones Avanzadas en Gas SAG vision and mission – Peruvian market We facilitate the encounter between the market and the best technologies.
Hand Protection Safety Moment. © 2015 HALLIBURTON. ALL RIGHTS RESERVED. 2 Hand Protection Hands are your most important tool!
Fuel cell system for DG and Power Quality applications
Constructive comments for improvement After my arrival in Namibia and especially to the farm where the project is being carried out. I have some suggestions.
Especificación de equipo contenerizado de generación eléctrica General Electric Jenbacher JGC420 a biogás POME Guatemala, marzo 2018 Agenda Especificaciones.
SMART MOBILITY Bernardo Baranda Sepulveda
Tema: LA FECHA EQ: How do I properly write dates in Spanish? Español I
FRACTIONAL REGULATION ENERGY SAVING DEVICE
Hoy vamos a .. aprender a describir vacaciones con más detalles
Requirements for Power Point page:
INDEX WHAT CRISIS? POLITICAL IMPACT SHIPBUILDING INDUSTRY STRUCTURE
Unit 6 – A Talking about the future A class by Mr. Jean Paul Quiñonez Touchstone 3.
© ERICO ®, Inc NFPA 70 National Electric Code (NEC) Grounding & Bonding.
Mi amigo Jaime vive ____ trabajar.
JKSimMet Software (windows & buttons) Split Engineering Chile Ltda. General Salvo #331 oficina 201 Casilla Sucursal Panorámico Providencia – Santiago,
ETV+ DRV/r + RAL in Treatment-Experienced Patients TRIO Trial.
Case Study W. K Allah, F. Ballard, A. Al-Dhafiri Saudi Aramco (Hydrocarbon Processing – August 2018)
Organización Mundial de la Salud
BONUS IDEAS 0-10 pts. Canciónes, arte, videos, poemas, etc.
ASEXUAL REPRODUCTION. ACTIVITY Complete the following chart. Method of A.R.
Welcome to PowerPoint gdskcgdskfcbskjc. Designer helps you get your point across PowerPoint Designer suggests professional designs for your presentation,
How to write my report. Checklist – what I need to include Cover page Contents page – with sections Introduction - aims of project - background information.
Miss Gabriela García and miss carolina ortiz
Basic 3 Course Orientation / Induction Week 1. AGENDA Course Information Aim of the Sessions Using zoom Assessment.
Stress Control Systems E n e r g y D i v i s i o n 1 72kV Termination design.
Transcripción de la presentación:

EN-EL SPS consolidation works in BA3, BB3 and BA7 during EYETS 16-17 (do not include users cabling and optical fibers) N. Dos Santos on behalf of EN-EL group 7 Dec. 2016 SPS Planning Meeting for EYETS 16-17

N. Dos Santos - EN/EL - 30 Nov 2016 Summary Introduction Project Team Actual systems and location BA3, BB3 Future systems, SLD and location BA3, BB3 Impacts on users Main cable campaign BA3-BB3 Planning N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Introduction Main references of EN-EL SPS consolidation project Strategy for consolidation of the SPS Electrical Networks : EDMS 1575869 (JP. Sferruzza, EN-EL) Renovation de la Sous-Station Electrique SPS BA1: EDMS 1506616 (JP. Sferruzza, EN-EL) Consolidation des systèmes 48 VDC, UPS et réseau distribution ondulé au SPS (SPS3 et SPS7): EDMS 1710115 (N. Dos Santos, EN-EL) Works foreseen in BA3, BB3 and BA7 during EYETS 16-17 N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Project Team EL-OP: Denis Ribiollet / Bruno S.-Sulpice Works et site coordination: Thierry Bourrel (UPS) Adrien Grinand (48 VDC) Studies and design: David Morvan Project and planning: Nuno Dos Santos Installation contract : C213 – COMSA (EMTE) N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Actual Systems in BA3, BB3 48 VDC (installed in 70’s) 2 systems actually in operation, 1 in BA3 and 1 in BB3 system of 80A each, MEP chargers 2 sets of batteries of 90 Ah each 2 commutation systems 3 main distribution switchboards (1 in BA3 and 2 in BB3) Very few spare parts, and low autonomy batteries No maintenance contract UPS (installed in 2000) 3 units of 60 kVA + 1 unit 10 kVA, several minutes of batteries autonomy 5 main distribution switchboards (3 in BA3 and 2 in BB3) 1 phase + N (230 V) distributed to users’ equip. and racks High complexity for operation and no protection discrimination N. Dos Santos - EN/EL - 30 Nov 2016

Actual Systems SLD for BA3, BB3 48 VDC UPS N. Dos Santos - EN/EL - 30 Nov 2016

Actual Systems location in BA3, BB3 48 VDC Systems BA3 BB3 N. Dos Santos - EN/EL - 30 Nov 2016

Actual Systems location in BA3, BB3 UPS Systems BA3 BB3 N. Dos Santos - EN/EL - 30 Nov 2016

New Systems SLD for BA3, BB3 48 VDC BA3 BB3 Machine equipment Safety/GS equipment N. Dos Santos - EN/EL - 30 Nov 2016

New Systems SLD for BA3, BB3 UPS N. Dos Santos - EN/EL - 30 Nov 2016

New Systems location in BA3, BB3 48 VDC Systems BA3 BB3 N. Dos Santos - EN/EL - 30 Nov 2016

New Systems location in BA3, BB3 UPS Systems BA3 BB3 N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Impact on users 48 VDC system and net NO IMPACT – transparent for users UPS system and net 1 to 2 weeks power off per switchboard (only from Jan 17) Depending on time for disconnection, dismantling, mechanical modification, installation, reconnection and commissioning Avoid temporary re-supply during works, only possible for safety equipment  contact Denis Ribiollet N. Dos Santos - EN/EL - 30 Nov 2016

Main cabling campaign BA3-BB3 During CERN EY closure and week 1, 2017 N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Planning BA3-BB3 Preparatory works start on 12 Dec 16 (taking in consideration PC tests) 15  21 Dec 2016 – no power off Local cabling campaign and works preparation Replacement of ERD350/B3 and EBD650-651/B3 (BB3) Install some few switchboards – EOD1/A3 not protected by UPS (re-supply from GS net) During EY CERN closure + week 1/17 – main cabling campaign with false floors opened From 9th Jan 2017 Power off – few days to 1-2 weeks per switchboard: EOD216/A3 (RF), EOD211-212/A3 (BA3 racks and PC), EOD1/A3 (computing room) EOD217-218/B3 (BB3 RF and PC) 48 VDC installation and replacement N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Planning BA7 From 14th Feb 2017 Cabling campaign and preparation works Power off – few days to 1-2 weeks per switchboard: EOD211/A7 (PC and racks), EOD3-4/A7 (racks) EOD1/A7 (computing room) 48VDC system installation and replacement N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides EOX303/A7 N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Back up slides N. Dos Santos - EN/EL - 30 Nov 2016

N. Dos Santos - EN/EL - 30 Nov 2016 Actual Systems in BA3, BB3 48 VDC UPS N. Dos Santos - EN/EL - 30 Nov 2016