Reporte Semanal ACORDE La conexión de los módulos de acorde se ha finalizado.
Se arreglaron los cables de HV. Se checo el estado de las fuentes de HV.
Encontramos la Branch Controller. Se acomodo un poco los cables encontrados en el magneto
Hay un problema con el piano cósmico que se tiene en exhibición en ALICE.
Plan till end of the year LS1 plan 2014 Weeks Extend SAA3 shielding 14-26 Ongoing Bottom TRDs (Miniframe suspension) 21-23 Done Reinstall and survey compensator magnet 24 (-3) Reinstall and bakeout RB24 beampipe 25-27 (-7) June Reinstall BCM and BLM 28-35 July/August Reinstall PMD 35 End August ZDCs and ZEM 35-37 (+10) August/September TRD17 Postponed (was in September) CPV 37 Beginning September PHOS 38-42 Mid Sept to mid Oct DCal, pump down central beampipe, LHC sector test P2 to P3 (w44) 43-45 Mid Oct to 1st week Nov Top TRDs, TPC RCU2 46-47 November Close L3 doors 48 End November Reinstall shielding walls and close plug, cosmic runs with L3 on 49-51 December 12/06/14 LS1 progress, P2 activities - A.Tauro
Mas imágenes
Asegurando el Futuro Gracias…