Descargar la presentación
La descarga está en progreso. Por favor, espere
1
Responsable Área de Innovación (FHA)
Grant Agreement Sistema Híbrido de Almacenamiento (H2 y baterías) para instalación aislada Pedro Casero Responsable Área de Innovación (FHA)
2
Supported by: The research leading to these results has received funding from the European Union´s H2020 Program for the Fuel Cells and Hydrogen Joint Technology Initiative (FCH2JU) under grant agreement nº
3
Contenido
4
Objectives Development and demonstration of an autonomous off-grid electrolysis system linked to renewable energy sources, including essential overarching communication and control system for optimising the overall efficiency when integrated in a real installation
5
Budget & schedule Grand total: €
6
Electrolizer (ITM)
7
voltage and current response to application of a 0% to 100% signal
Electrolizer (ITM) voltage and current response to application of a 0% to 100% signal Stack current Stack voltage Stack power
8
Fuente renovable (FHA)
9
HSS (Hybrid Storage System)
50 kW Ely & BOP New 62.4 kWp EPIC Fuel cell FHA ITM INYCOM Parcela 23 20 bar Buffer 32 bar 4 m3 350 bar 11 kg (32 bar) 7 kg (20 bar) 23 kg Elemento Valor “esenciales” (PLC, varios (ITM)) < 2400 W (heat tracing 1000 W) Baterías 30 kWh (12 – 24 horas) FC 4500 W Reserva H2 necesaria 7-10 kg (5 días)
10
HSS (Hybrid Storage System)
Perfil diario (todo el H2 producido se exporta) Almacenamiento de H2 requerido Producción diaria de H2 Estado de carga de H2 Mínima reserva de H2
11
Conclusiones
Presentaciones similares
© 2025 SlidePlayer.es Inc.
All rights reserved.