La descarga está en progreso. Por favor, espere

La descarga está en progreso. Por favor, espere

Workshop Estratégico ¿Qué espero de HP-CAST Ibérica? CICA, Sevilla 13 y 14 de noviembre de 2008.

Presentaciones similares


Presentación del tema: "Workshop Estratégico ¿Qué espero de HP-CAST Ibérica? CICA, Sevilla 13 y 14 de noviembre de 2008."— Transcripción de la presentación:

1 Workshop Estratégico ¿Qué espero de HP-CAST Ibérica? CICA, Sevilla 13 y 14 de noviembre de 2008

2 Agenda 1.¿Qué es HP-CAST? Una breve historia Participantes Afiliados Jornadas Junta Directiva 2.¿Qué es HP-CAST Ibérica? 3.Otros temas de debate

3 ¿Qué es HP-CAST? The Hewlett-Packard Consortium for Advanced Scientific and Technical Computing Users Group will work to increase the capabilities of large-scale, parallel scientific and technical computing, to promote the exchange of information and understanding of these systems, and to provide guidance to HP on the essential development and support issues for large-scale technical systems.

4 Background Information HP-CAST is the result of the agreement made in Santa Fe, New Mexico, on the 20th of March of 2003 to merge three Users Groups: 1.The Compaq Alpha Scientific and Technical Users Group (CAST), created at Oak Ridge, Tennessee, in the Fall of 2000 by: CEA/DAM. Lawrence Livermore National Laboratory. Los Alamos National Laboratory. Oak Ridge National Laboratory. Pittsburgh Supercomputing Center. Sandia National Laboratory. Wright Patterson Air Force Base/ASC. 2.The USs High Performance Computing User Group (HPCUG), created at Dallas, Texas, in the Spring of 1994. 3.The Hewlett-Packards High Performance Computing European User Group (HP 2 EUG), created at Krakow, Poland, on the 20th of October, 1994.

5 Article 1. HP-CAST Membership 1.Membership in HP-CAST is by institution. A multi-site institution is represented as a single HP-CAST member. 2.Each HP-CAST member institution has a single vote on all HP-CAST activities and motions. 3.HP-CAST members must have a signed and current non-disclosure agreement with HP. 4.Applying institutions are required to either have a large system, or have entered into a contract to have a large system delivered to their site within one year. 5.To retain active status as a HP-CAST member site, institutions must maintain a large system configuration. The size of the configuration must not drop below that required to be considered for initial membership. If the system configuration changes significantly at any member institution, that institution's status as an active member will be reviewed and reconsidered by a vote of the remaining HP-CAST membership. If the result of the remaining HP-CAST membership vote is to remove a specified site from HP-CAST, then that institution shall be removed from membership roles and will not be permitted to attend HP-CAST meetings and participate in HP-CAST discussions. Organizations that are removed as member institutions shall be reconsidered for future membership at which time they again meet membership criteria and apply to join HP-CAST. 6.A member institution may remove itself from HP-CAST by request of the site representative to the HP-CAST Secretary.

6 Article 2. Affiliates 1.An affiliate is an institution that is providing solutions to enhance HP-CAST members use of systems for scientific and technical computing, but is not a member of HP-CAST or does not otherwise qualify for membership. 2.Hewlett-Packard (HP) is an affiliate of HP-CAST, not a voting member institution. 3.HP-CAST affiliates must also have a signed and current non-disclosure agreement with HP. 4.An affiliate institution may remove itself from HP- CAST by request of its representative to the HP- CAST Secretary.

7 Jornadas HP-CAST CASTHPCUGHP 2 EUG 1997Kraków, PL 1998Zurich, CH 1999Tromsø, NO 2000Oak Ridge, TNSan Jose, CABarcelona, ES 2001Paris, FRSan Mateo, CABremen, DE Boston, MA 2002San Francisco, CA Galway, IR 2003Santa Fe, NM Dallas, TX 2004Gold Coast, AUPittsburgh, PA 2005Kraków, PLSeattle, WA 2006Seoul, KRTampa, FL 2007Karlsruhe, DEReno, NV 2008Singapore, SGAustin, TX

8 Asistentes a las jornadas May05 Kraków Fall04 Pittsburgh March04 Gold Coast Fall03 Dallas Spring03 Santa Fe Fall02 Galway Spring02 S. Francisco North America: US Gov. Labs. 25692512 9 North America: others 416819 9 4 Europe 39161113811 22 Asia/Pacific 81123119 5 HP 31 3981 46 29 Partners/Aff. 12311915 4 Total 9682981321359273

9 Article 5. Officers and Elections 1. The Board of Directors of HP-CAST will consist of three officers, four regional directors, and one HP liaison, with no voting rights. 2. The officers will be President, Vice President, and Secretary. 6. The regional directors positions represent: a. a. North America. b. b. Europe. c. c. Asia/Pacific. d. d. At Large. 7. Officers and directors will serve two-year terms, elected in alternative years. 8. Officers must be elected by a plurality of those voting, except the HP liaison who will be directly nominated by HP.

10 ¿Qué es HP-CAST Ibérica? El capítulo territorial de HP-CAST para España y Portugal Grupo de Usuarios vs. Asociación Junta Directiva: Javier García Tobio, presidente Miquel Huguet Vilella, vicepresidente Juan Ortega Ramírez, secretario Isidro Cano, enlace HP Belén Igual, organización y logística

11 Otros temas de debate Supermáquinas de Pflop/s, utilidad práctica Presupuestos FEDER y fondos públicos Relación con las diferentes Redes: e-Ciencia, Ibergrid… Impulsar HP-CAST Ibérica Acceso privilegiado u especial a la información: ¿En qué se está trabajando/investigando? (evolución tecnología) Sharing HP-CAST WWW: aprovecharnos de las sinergias y experiencias de otros clientes HPC Puente de Acceso hacia colaboraciones Internacionales con otros centros con tecnología HP HPC Relación y Colaboración con HP LABs: Investigación conjunta entre Centros y HP

12 Supercomputación en España R punta agregado SistemaNúcleosR punta BSCBladeCenter JS21 PPC 970 2,3 GHz 10.24062,3 FSCSn/d2.56025,0 RES-CeSVIMABladeCenter JS21 PPC 970 2,2 GHz 2.40821,1 CESGASuperdome Itanium2 1,6 GHz 2.52816,2 FPCMSistema Blade Xeon QC 3,0 GHz 8169,8 CICASunFire x2200/x4600 Opteron 2,2 GHz 1.2485,4 RES x 5BladeCenter JS21 PPC 970 2,2 GHz 5124,4 INMCray X1E MSP 1,13 GHz 1282,3 CESCAAltix 3700 Bx2 Itanium2 1,6 GHz 1280,8 CIEMATAltix 3700 Bx2 Itanium2 1,3 GHz 960,5 x10,6 x1,4 x3,0 x1,1 2008INMCIEMATCICACESCACESGABSCRESFPCMFCSC Núcleos1284168483642.94210.2404.9689442.560 R punta 2,31,67,81,519,562,342,610,625,0 x1,2

13 SEPAC Grid


Descargar ppt "Workshop Estratégico ¿Qué espero de HP-CAST Ibérica? CICA, Sevilla 13 y 14 de noviembre de 2008."

Presentaciones similares


Anuncios Google