Juan Sebastian Alarcon Tomas Vargas Santiago Sanchez Camilo Mendez
SmartHand Juan Sebastian Alarcon Tomas Vargas Santiago Sanchez Camilo Mendez Main Contributors: Luz Stella guarín. Professor in charge Narciso Sanchez. Supervisor
2
Gimnasio los caobos Estudiantes y colaboradores Juan Sebastian Alarcon
Tomas Vargas Santiago Sanchez Camilo Mendez Luz Stella guarín. Professor in charge Narciso Sanchez. Supervisor
3
What does SmartHand consist of?
It consists of an effective way to immediately locate users who have been victims of some kind of natural or provoked disaster
4
What is SmartHand? It is a smart locator (GPS) whose function is to save lives in any type of accident or misfortune. Image taken from :
5
What will benefit our project?
Develop a general and everyday use product employed and developed to save the life of the user Reduction of the mortality rate Help people Prove that technology is vital to the life of man
6
The Chronogram of the project
Month 1 Month 2 Month 3 ACTIVITIES search and recollection of data Cataloging of information Analysis of information writing of the investigative project SmartHand development
7
PROPOSED METHODOLOGY IDENTIFICATION, RECOLLECTION AND ANALYSIS OF INFORMATION DEFINITION OF RESOURCES TO BE USED FOR THE DESIGN AND FUTURE FUNCTIONING OF "SMARTHAND" DESIGN OF INTERNAL AND EXTERNAL COMPONENTS OF THE "SMARTHAND" SUMMARY AND CONCLUSIONS
8
Why Use GPS Technology To determine the position of the injured passenger, which is the main function of this product, we must refer to the terrestrial coordinate system, because if there is no defined coordinate system with worldwide acceptance, it would be impossible to define the location of anything on earth. Thus, the bracelet must supply the position based on the international system indicating latitude and longitude.
9
BATTERY In terms of energy consumption, the Smarthand also becomes a role model as it makes part of the few devices of this type that runs on sunlight, a clean and renewable resource.
10
Pulse meter and LED The capacitor, microcontroller, LED, regulator and heart rate sensor components are located in the lower plate. The reason for this location lies mainly in the direct contact of the sensor with the radial artery, making reading easier and more reliable. LED on: good condition LED off: poor condition LED blinking: high risk Placa Superior Placa Inferior
11
Product Materials Button clasp
12
Project Plans Estudio de forma, bocetos iniciales,
Fuente: Elaboración propia, Técnica: Lápiz Bocetos preliminares, posible forma, posición de la celda solar, indicador LED, cierres. Fuente: Elaboración propia, Técnica: Lápiz Componentes internos manilla Smarthand Fuente: Elaboración propia, Técnica: Lápiz Modo de uso Fuente: Elaboración propia, Técnica: Lápiz Vista superior celda solar, vista inferior indicador LED Fuente: Elaboración propia, Técnica: Lápiz Forma, dimensiones y medidas. Fuente: Elaboración propia, Técnica: Lápiz
13
Final Product